IAC logo
IAC Assessment: IA0471
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0471
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2011
Principal Product Poultry and Hog Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $50,000,000-$100,000,000
# of Employees 22
Plant Area (Sq.Ft.) 50,000
Annual Production 800,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $350,581 7,027,200 kWh $0.05
Electricity Demand $182,536 18,564 kW-months/year $9.83
Electricity Fees $404 - $ -
Natural Gas $151,593 30,675 MMBtu $4.94
TOTAL ENERGY COSTS $685,114
RECOMMENDED SAVINGS* $7,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,909
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$262
Cost:
$250
$123 2,464 $139 14 - - $123
2,464
kWh
$139
14
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$979
Cost:
$1,463
$979 19,615 - - - - $979
19,615
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,799
Cost:
$227
- - - - $1,799 324 -
-
kWh
-
-
kW-months/year
$1,799
324
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,430
Cost:
$3,832
$1,553 31,133 $877 90 - - $1,553
31,133
kWh
$877
90
kW-months/year
-
-
MMBtu
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$465
Cost:
$3,000
- - - - $465 94 -
-
kWh
-
-
kW-months/year
$465
94
MMBtu
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,974
Cost:
$1,500
$1,974 39,564 - - - - $1,974
39,564
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,909
Cost:
$10,272
$4,629 92,776 $1,016 104 $2,264 418 $4,629
92,776
kWh
$1,016
104
kW-months/year
$2,264
418
MMBtu
TOTAL IMPLEMENTED Savings:
$7,909
Cost:
$10,272
$4,629 92,776 $1,016 104 $2,264 418 $4,629
92,776
kWh
$1,016
104
kW-months/year
$2,264
418
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas