IAC logo
IAC Assessment: IA0477
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0477
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2012
Principal Product Boat Trailers
NAICS 336214 - Travel Trailer and Camper Manufacturing
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 241
Plant Area (Sq.Ft.) 300,000
Annual Production 280,000 Pieces
Production Hrs. Annual 2,730
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,981 5,202,511 kWh $0.03
Electricity Demand $47,047 14,030 kW-months/year $3.35
Natural Gas $172,074 31,802 MMBtu $5.41
TOTAL ENERGY COSTS $393,102
RECOMMENDED SAVINGS* $43,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,752
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,752
Cost:
$52,500
$24,323 726,058 $429 128 - - $24,323
726,058
kWh
$429
128
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,202
Cost:
$609
$8,036 239,890 $166 49 - - $8,036
239,890
kWh
$166
49
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$436
Cost:
$719
$436 13,064 - - - - $436
13,064
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,175
Cost:
$5,087
$2,759 82,368 $1,416 422 - - $2,759
82,368
kWh
$1,416
422
kW-months/year
-
-
MMBtu
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,536
Cost:
$18
- - - - $1,536 284 -
-
kWh
-
-
kW-months/year
$1,536
284
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,869
Cost:
$206
$1,652 49,327 $217 67 - - $1,652
49,327
kWh
$217
67
kW-months/year
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,407
Cost:
$630
- - - - $1,407 260 -
-
kWh
-
-
kW-months/year
$1,407
260
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$431
Cost:
$153
$431 12,870 - - - - $431
12,870
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$762
Cost:
$3,574
$622 18,573 $140 42 - - $622
18,573
kWh
$140
42
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,570
Cost:
$63,496
$38,259 1,142,150 $2,368 709 $2,943 544 $38,259
1,142,150
kWh
$2,368
709
kW-months/year
$2,943
544
MMBtu
TOTAL IMPLEMENTED Savings:
$24,752
Cost:
$52,500
$24,323 726,058 $429 128 - - $24,323
726,058
kWh
$429
128
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas