IAC Assessment: IA0497
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0497
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2013
Principal Product Fan clutches
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3519 - Internal Combustion Engines, Nec
Sales $100,000,000-$500,000,000
# of Employees 188
Plant Area (Sq.Ft.) 155,000
Annual Production 250,000 Pieces
Production Hrs. Annual 5,980
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,169 7,010,180 kWh $0.05
Electricity Demand $148,253 16,884 kW-months/year $8.78
LPG $45,951 3,320 MMBtu $13.84
TOTAL ENERGY COSTS $527,373
RECOMMENDED SAVINGS* $50,524 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$19,923
Cost:
$46,094
$14,544 306,176 $5,379 614 - - $14,544
306,176
kWh
$5,379
614
kW-months/year
-
-
MMBtu
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$1,463
Cost:
$2,391
$1,068 22,485 $395 45 - - $1,068
22,485
kWh
$395
45
kW-months/year
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,575
Cost:
$3,675
$3,340 70,325 $1,235 141 - - $3,340
70,325
kWh
$1,235
141
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,214
Cost:
$1,720
$3,077 64,774 $1,137 130 - - $3,077
64,774
kWh
$1,137
130
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,881
Cost:
$4,000
$8,681 182,505 $3,200 366 - - $8,681
182,505
kWh
$3,200
366
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,468
Cost:
$1,500
- - - - $1,468 106 -
-
kWh
-
-
kW-months/year
$1,468
106
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,000
Cost:
$7,560
$7,000 147,526 - - - - $7,000
147,526
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$50,524
Cost:
$66,940
$37,710 793,791 $11,346 1,297 $1,468 106 $37,710
793,791
kWh
$11,346
1,297
kW-months/year
$1,468
106
MMBtu
TOTAL IMPLEMENTED Savings:
$25,605
Cost:
$49,314
$17,621 370,950 $6,516 744 $1,468 106 $17,621
370,950
kWh
$6,516
744
kW-months/year
$1,468
106
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG