IAC Assessment: IA0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2013
Principal Product automotive spark plugs
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3694 - Engine Electrical Equipment
Sales $50,000,000-$100,000,000
# of Employees 430
Plant Area (Sq.Ft.) 184,000
Annual Production 92,400,000 Pieces
Production Hrs. Annual 8,560
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $637,605 18,544,050 kWh $0.03
Electricity Demand $310,417 32,831 kW-months/year $9.45
Electricity Fees $192,360 - $ -
Natural Gas $446,146 76,100 MMBtu $5.86
TOTAL ENERGY COSTS $1,586,528
RECOMMENDED SAVINGS* $264,697 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,266
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$218,077
Cost:
$1,045,200
- - - - - - $218,077 34,940 -
-
kWh
-
-
kW-months/year
-
-
$
$218,077
34,940
MMBtu
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$14,349
Cost:
$3,750
- - - - - - $14,349 2,449 -
-
kWh
-
-
kW-months/year
-
-
$
$14,349
2,449
MMBtu
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,845
Cost:
$1,000
- - - - - - $2,845 485 -
-
kWh
-
-
kW-months/year
-
-
$
$2,845
485
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,113
Cost:
$6,000
- - - - $6,113 - - - -
-
kWh
-
-
kW-months/year
$6,113
-
$
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$689
Cost:
$1,590
$689 20,080 - - - - - - $689
20,080
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,734
Cost:
$5,775
$6,734 196,327 - - - - - - $6,734
196,327
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$598
Cost:
$394
$386 11,268 $212 22 - - - - $386
11,268
kWh
$212
22
kW-months/year
-
-
$
-
-
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,512
Cost:
$1,000
- - - - - - $3,512 599 -
-
kWh
-
-
kW-months/year
-
-
$
$3,512
599
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,758
Cost:
$976
- - - - - - $3,758 641 -
-
kWh
-
-
kW-months/year
-
-
$
$3,758
641
MMBtu
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,022
Cost:
$210
$4,516 131,689 $3,506 368 - - - - $4,516
131,689
kWh
$3,506
368
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$264,697
Cost:
$1,065,895
$12,325 359,364 $3,718 390 $6,113 - $242,541 39,114 $12,325
359,364
kWh
$3,718
390
kW-months/year
$6,113
-
$
$242,541
39,114
MMBtu
TOTAL IMPLEMENTED Savings:
$31,266
Cost:
$14,316
$689 20,080 - - $6,113 - $24,464 4,174 $689
20,080
kWh
-
-
kW-months/year
$6,113
-
$
$24,464
4,174
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas