IAC logo
IAC Assessment: IA0510
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0510
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2013
Principal Product Ammunition
NAICS 332993 - Ammunition (except Small Arms) Manufacturing
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales <$500,000
# of Employees 900
Plant Area (Sq.Ft.) 1,001
Annual Production 0 Units
Production Hrs. Annual 2,625
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $745,379 22,766,533 kWh $0.03
Electricity Demand $546,058 46,057 kW-months/year $11.86
Natural Gas $829,694 188,457 MMBtu $4.40
Coal $1,367,055 329,410 MMBtu $4.15
TOTAL ENERGY COSTS $3,488,186
RECOMMENDED SAVINGS* $118,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Coal Electricity Usage Electricity Demand Natural Gas Coal
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$58,322
Cost:
$6,395
- - - - $19,432 4,616 $38,890 9,371 -
-
kWh
-
-
kW-months/year
$19,432
4,616
MMBtu
$38,890
9,371
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,547
Cost:
$2,769
- - - - $2,527 600 $5,020 1,210 -
-
kWh
-
-
kW-months/year
$2,527
600
MMBtu
$5,020
1,210
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,742
Cost:
$30,000
$13,742 418,953 - - - - - - $13,742
418,953
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,760
Cost:
$600
$8,539 260,350 $4,221 356 - - - - $8,539
260,350
kWh
$4,221
356
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,723
Cost:
$30
$3,161 96,360 $1,562 132 - - - - $3,161
96,360
kWh
$1,562
132
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,748
Cost:
$7,018
$657 20,157 $1,091 92 - - - - $657
20,157
kWh
$1,091
92
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,538
Cost:
$30,502
$5,489 167,342 $9,049 766 - - - - $5,489
167,342
kWh
$9,049
766
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,980
Cost:
$1,290
$553 16,877 - - $1,474 350 $2,953 712 $553
16,877
kWh
-
-
kW-months/year
$1,474
350
MMBtu
$2,953
712
MMBtu
TOTAL RECOMMENDED Savings:
$118,360
Cost:
$78,604
$32,141 980,039 $15,923 1,346 $23,433 5,566 $46,863 11,293 $32,141
980,039
kWh
$15,923
1,346
kW-months/year
$23,433
5,566
MMBtu
$46,863
11,293
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Coal Electricity Usage Electricity Demand Natural Gas Coal