IAC logo
IAC Assessment: IA0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2013
Principal Product Steel Doors and Frames
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $100,000,000-$500,000,000
# of Employees 625
Plant Area (Sq.Ft.) 324,000
Annual Production 2,775,000 Pieces
Production Hrs. Annual 4,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $263,934 7,717,407 kWh $0.03
Electricity Demand $305,762 20,235 kW-months/year $15.11
Electricity Fees $7,292 - $ -
Natural Gas $182,918 40,873 MMBtu $4.48
TOTAL ENERGY COSTS $759,906
RECOMMENDED SAVINGS* $43,415 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,997
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,448
Cost:
$356
$3,106 69,842 $3,342 233 - - $3,106
69,842
kWh
$3,342
233
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,848
Cost:
$100
$6,820 200,000 $9,028 600 - - $6,820
200,000
kWh
$9,028
600
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,424
Cost:
$70
$1,323 38,800 $1,101 73 - - $1,323
38,800
kWh
$1,101
73
kW-months/year
-
-
MMBtu
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$629
Cost:
$890
- - - - $629 140 -
-
kWh
-
-
kW-months/year
$629
140
MMBtu
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$504
Cost:
$530
- - - - $504 112 -
-
kWh
-
-
kW-months/year
$504
112
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$277
Cost:
$200
- - - - $277 62 -
-
kWh
-
-
kW-months/year
$277
62
MMBtu
07: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$17,286
Cost:
$135,000
$2,746 80,525 $14,540 972 - - $2,746
80,525
kWh
$14,540
972
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,415
Cost:
$137,146
$13,995 389,167 $28,011 1,878 $1,409 315 $13,995
389,167
kWh
$28,011
1,878
kW-months/year
$1,409
315
MMBtu
TOTAL IMPLEMENTED Savings:
$24,997
Cost:
$726
$11,249 308,642 $13,471 906 $277 62 $11,249
308,642
kWh
$13,471
906
kW-months/year
$277
62
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas