IAC logo
IAC Assessment: IA0526
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0526
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2014
Principal Product Machined Parts
NAICS 332439 - Other Metal Container Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 120,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,549 4,757,952 kWh $0.05
Electricity Demand $56,391 7,961 kW-months/year $7.08
Electricity Fees $12,740 - $ -
Natural Gas $59,609 9,288 MMBtu $6.42
TOTAL ENERGY COSTS $356,289
RECOMMENDED SAVINGS* $28,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,860
Cost:
$845
$10,685 223,383 $2,175 307 - - $10,685
223,383
kWh
$2,175
307
kW-months/year
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,840
Cost:
$1,090
$2,840 59,405 - - - - $2,840
59,405
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,290
Cost:
$27,423
$7,717 161,442 $1,573 222 - - $7,717
161,442
kWh
$1,573
222
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,757
Cost:
$460
- - - - $1,757 274 -
-
kWh
-
-
kW-months/year
$1,757
274
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$571
Cost:
$1,430
$571 11,945 - - - - $571
11,945
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$847
Cost:
$4,000
- - - - $847 132 -
-
kWh
-
-
kW-months/year
$847
132
MMBtu
TOTAL RECOMMENDED Savings:
$28,165
Cost:
$35,248
$21,813 456,175 $3,748 529 $2,604 406 $21,813
456,175
kWh
$3,748
529
kW-months/year
$2,604
406
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas