Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2015 |
Principal Product | Grain and feed handling equipment |
NAICS | 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 3,000 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,267 | 2,377,890 | kWh | $0.04 |
Electricity Demand | $130,822 | 7,690 | kW-months/year | $17.01 |
Natural Gas | $89,434 | 13,650 | MMBtu | $6.55 |
TOTAL ENERGY COSTS | $321,523 | |||
RECOMMENDED SAVINGS* | $28,857 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,710 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $12,942 Cost: $244 |
- | - | - | - | $12,942 | 1,976 |
- - kWh |
- - kW-months/year |
$12,942 1,976 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,348 Cost: $332 |
$1,221 | 28,600 | $1,127 | 66 | - | - |
$1,221 28,600 kWh |
$1,127 66 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $5,197 Cost: $20,000 |
- | - | - | - | $5,197 | 793 |
- - kWh |
- - kW-months/year |
$5,197 793 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,930 Cost: $2,873 |
$1,520 | 35,589 | $1,410 | 83 | - | - |
$1,520 35,589 kWh |
$1,410 83 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,490 Cost: $6,563 |
$1,179 | 27,619 | $1,311 | 77 | - | - |
$1,179 27,619 kWh |
$1,311 77 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $1,368 Cost: $4,943 |
- | - | - | - | $1,368 | 209 |
- - kWh |
- - kW-months/year |
$1,368 209 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,311 Cost: $480 |
$714 | 16,633 | $597 | 37 | - | - |
$714 16,633 kWh |
$597 37 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $271 Cost: $780 |
$141 | 3,300 | $130 | 8 | - | - |
$141 3,300 kWh |
$130 8 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,857 Cost: $36,215 |
$4,775 | 111,741 | $4,575 | 270 | $19,507 | 2,978 | $4,775 111,741 kWh |
$4,575 270 kW-months/year |
$19,507 2,978 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,710 Cost: $10,012 |
$3,920 | 91,808 | $3,848 | 226 | $12,942 | 1,976 | $3,920 91,808 kWh |
$3,848 226 kW-months/year |
$12,942 1,976 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |