IAC logo
IAC Assessment: IA0543
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0543
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2015
Principal Product Stationary and mobile concrete mixers
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 117,480
Annual Production 500 Pieces
Production Hrs. Annual 2,600
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,863 1,111,250 kWh $0.06
Electricity Demand $13,610 3,120 kW-months/year $4.36
Natural Gas $38,058 6,741 MMBtu $5.65
TOTAL ENERGY COSTS $115,531
RECOMMENDED SAVINGS* $22,617 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,975
Cost:
$37,170
$12,157 211,432 $3,818 876 $12,157
211,432
kWh
$3,818
876
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,917
Cost:
$4,772
$1,917 33,346 - - $1,917
33,346
kWh
-
-
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,799
Cost:
$4,205
$1,799 31,292 - - $1,799
31,292
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$792
Cost:
$3,266
$583 10,140 $209 48 $583
10,140
kWh
$209
48
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$732
Cost:
$203
$544 9,464 $188 43 $544
9,464
kWh
$188
43
kW-months/year
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$576
Cost:
$500
$240 4,170 $336 77 $240
4,170
kWh
$336
77
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$503
Cost:
$70
$377 6,552 $126 29 $377
6,552
kWh
$126
29
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$323
Cost:
$290
$323 5,616 - - $323
5,616
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$22,617
Cost:
$50,476
$17,940 312,012 $4,677 1,073 $17,940
312,012
kWh
$4,677
1,073
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand