Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2016 |
Principal Product | Livestock Gates |
NAICS | 332323 - Ornamental and Architectural Metal Work Manufacturing |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 76 |
Plant Area (Sq.Ft.) | 62,336 |
Annual Production | 8,250,000 Pounds |
Production Hrs. Annual | 8,112 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $180,238 | 2,903,280 | kWh | $0.06 |
Electricity Demand | $96,360 | 9,468 | kW-months/year | $10.18 |
Natural Gas | $141,854 | 25,568 | MMBtu | $5.55 |
TOTAL ENERGY COSTS | $418,452 | |||
RECOMMENDED SAVINGS* | $50,510 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,034 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $36,574 Cost: $23,858 |
$27,688 | 446,604 | $8,886 | 883 | - | - |
$27,688 446,604 kWh |
$8,886 883 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,085 Cost: $9,800 |
$4,085 | 65,895 | - | - | - | - |
$4,085 65,895 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,881 Cost: $4,905 |
$2,881 | 46,461 | - | - | - | - |
$2,881 46,461 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,796 Cost: $3,898 |
$1,796 | 29,030 | - | - | - | - |
$1,796 29,030 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,632 Cost: $513 |
$1,146 | 18,532 | $486 | 49 | - | - |
$1,146 18,532 kWh |
$486 49 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,391 Cost: $462 |
- | - | - | - | $1,391 | 250 |
- - kWh |
- - kW-months/year |
$1,391 250 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,271 Cost: $90 |
$958 | 15,392 | $313 | 31 | - | - |
$958 15,392 kWh |
$313 31 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $880 Cost: $120 |
- | - | - | - | $880 | 160 |
- - kWh |
- - kW-months/year |
$880 160 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,510 Cost: $43,646 |
$38,554 | 621,914 | $9,685 | 964 | $2,271 | 410 | $38,554 621,914 kWh |
$9,685 964 kW-months/year |
$2,271 410 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,034 Cost: $33,384 |
$34,469 | 556,019 | $9,685 | 964 | $880 | 160 | $34,469 556,019 kWh |
$9,685 964 kW-months/year |
$880 160 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |