Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2016 |
Principal Product | Aluminum Die Casting |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 8,000,000 Units |
Production Hrs. Annual | 5,070 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $225,209 | 6,566,278 | kWh | $0.03 |
Electricity Demand | $174,174 | 14,256 | kW-months/year | $12.22 |
Electricity Fees | $24,675 | - | $ | - |
Natural Gas | $179,823 | 29,627 | MMBtu | $6.07 |
TOTAL ENERGY COSTS | $603,881 | |||
RECOMMENDED SAVINGS* | $33,540 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,882 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,138 Cost: $37,931 |
$5,241 | 152,022 | $4,897 | 400 | - | - |
$5,241 152,022 kWh |
$4,897 400 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,696 Cost: $7,568 |
$8,696 | 255,753 | - | - | - | - |
$8,696 255,753 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $4,852 Cost: $13,275 |
$2,628 | 76,626 | $2,224 | 181 | - | - |
$2,628 76,626 kWh |
$2,224 181 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,656 Cost: $560 |
$504 | 14,688 | $4,152 | 338 | - | - |
$504 14,688 kWh |
$4,152 338 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,962 Cost: $4,050 |
- | - | - | - | $1,962 | 323 |
- - kWh |
- - kW-months/year |
$1,962 323 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,484 Cost: $700 |
$630 | 18,379 | $854 | 70 | - | - |
$630 18,379 kWh |
$854 70 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,182 Cost: $1,900 |
$420 | 12,220 | $762 | 62 | - | - |
$420 12,220 kWh |
$762 62 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $570 Cost: $2,800 |
$570 | 16,624 | - | - | - | - |
$570 16,624 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,540 Cost: $68,784 |
$18,689 | 546,312 | $12,889 | 1,051 | $1,962 | 323 | $18,689 546,312 kWh |
$12,889 1,051 kW-months/year |
$1,962 323 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,882 Cost: $57,166 |
$9,993 | 290,559 | $12,889 | 1,051 | - | - | $9,993 290,559 kWh |
$12,889 1,051 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |