IAC Assessment: IC0007
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0007
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2001
Principal Product Teflon Coated Products
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 28,000
Annual Production 250,000,000 Pieces
Production Hrs. Annual 5,486
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,353 1,340,858 kWh $0.03
Electricity Demand $51,881 4,257 kW-months/year $12.19
Electricity Fees $12,948 - $ -
Natural Gas $67,322 10,036 MMBtu $6.71
TOTAL ENERGY COSTS $204,204
RECOMMENDED SAVINGS* $84,092 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,116
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,050
Cost:
$2,125
$9,109 260,286 $6,941 569 - - - - - - - - $9,109
260,286
kWh
$6,941
569
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,195
Cost:
$25,250
- - - - $10,195 1,520 - - - - - - -
-
kWh
-
-
kW-months/year
$10,195
1,520
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,066
Cost:
$195
- - - - $3,066 457 - - - - - - -
-
kWh
-
-
kW-months/year
$3,066
457
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,387
Cost:
$18,965
$1,808 51,663 $1,579 130 - - - - - - - - $1,808
51,663
kWh
$1,579
130
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$94
Cost:
$372
$39 1,106 $55 5 - - - - - - - - $39
1,106
kWh
$55
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,200
Cost:
$1,800
- - - - - - $6,200 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,200
-
lb
-
-
$
-
-
$
07: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$9,100
Cost:
$35,000
- - - - - - - - $9,100 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$9,100
-
$
-
-
$
08: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$36,000
Cost:
$4,400
- - - - - - - - - - $36,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$36,000
-
$
TOTAL RECOMMENDED Savings:
$84,092
Cost:
$88,107
$10,956 313,055 $8,575 704 $13,261 1,977 $6,200 - $9,100 - $36,000 - $10,956
313,055
kWh
$8,575
704
kW-months/year
$13,261
1,977
MMBtu
$6,200
-
lb
$9,100
-
$
$36,000
-
$
TOTAL IMPLEMENTED Savings:
$55,116
Cost:
$6,720
$9,109 260,286 $6,941 569 $3,066 457 - - - - $36,000 - $9,109
260,286
kWh
$6,941
569
kW-months/year
$3,066
457
MMBtu
-
-
lb
-
-
$
$36,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes