IAC logo
IAC Assessment: IC0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2001
Principal Product Steel Construction Studs
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 80,000
Annual Production 26,000,000 Pounds
Production Hrs. Annual 4,335
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,556 297,653 kWh $0.04
Electricity Demand $10,753 977 kW-months/year $11.01
Natural Gas $76,429 8,456 MMBtu $9.04
TOTAL ENERGY COSTS $91,238
RECOMMENDED SAVINGS* $18,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $474
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,966
Cost:
$41,300
$4,516 102,636 $6,650 604 - - - - - - $800 - $4,516
102,636
kWh
$6,650
604
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$800
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$474
Cost:
$400
$280 6,359 $194 18 - - - - - - - - $280
6,359
kWh
$194
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$129
Cost:
$550
$77 1,744 $52 5 - - - - - - - - $77
1,744
kWh
$52
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,684
Cost:
-
$(-1,166) (-26,497) $(-738) (-67) $5,588 606 - - - - - - $(-1,166)
(-26,497)
kWh
$(-738)
(-67)
kW-months/year
$5,588
606
MMBtu
-
-
$
-
-
$
-
-
$
05: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$2,350
Cost:
$1,900
- - - - - - $950 - $1,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$950
-
$
$1,400
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$18,603
Cost:
$44,150
$3,707 84,242 $6,158 560 $5,588 606 $950 - $1,400 - $800 - $3,707
84,242
kWh
$6,158
560
kW-months/year
$5,588
606
MMBtu
$950
-
$
$1,400
-
$
$800
-
$
TOTAL IMPLEMENTED Savings:
$474
Cost:
$400
$280 6,359 $194 18 - - - - - - - - $280
6,359
kWh
$194
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost