IAC Assessment: IC0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Electropolishing
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 40,000
Annual Production 55,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,934 2,774,018 kWh $0.05
Electricity Demand $30,678 27,613 kW-months/year $1.11
Electricity Fees $30,879 - $ -
Natural Gas $103,625 12,044 MMBtu $8.60
TOTAL ENERGY COSTS $534,716
RECOMMENDED SAVINGS* $294,926 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,947
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$945
Cost:
$8,326
$814 12,313 $60 54 $9 - - - $62 - $814
12,313
kWh
$60
54
kW-months/year
$9
-
$
-
-
$
$62
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,379
Cost:
$25,075
$8,223 125,252 $273 246 $518 - - - $1,365 - $8,223
125,252
kWh
$273
246
kW-months/year
$518
-
$
-
-
$
$1,365
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$102
Cost:
$150
$94 1,435 $8 7 - - - - - - $94
1,435
kWh
$8
7
kW-months/year
-
-
$
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$205,600
Cost:
$100,000
- - - - $205,600 - - - - - -
-
kWh
-
-
kW-months/year
$205,600
-
$
-
-
$
-
-
$
05: 4.426 MODIFY WORKLOAD Savings:
$77,900
Cost:
$23,900
- - - - $77,100 - $800 - - - -
-
kWh
-
-
kW-months/year
$77,100
-
$
$800
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$294,926
Cost:
$157,451
$9,131 139,000 $341 307 $283,227 - $800 - $1,427 - $9,131
139,000
kWh
$341
307
kW-months/year
$283,227
-
$
$800
-
$
$1,427
-
$
TOTAL IMPLEMENTED Savings:
$78,947
Cost:
$32,376
$908 13,748 $68 61 $77,109 - $800 - $62 - $908
13,748
kWh
$68
61
kW-months/year
$77,109
-
$
$800
-
$
$62
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost