Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Public Building and Related Furniture
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 217,000
Annual Production 400,000 Pieces
Production Hrs. Annual 4,845
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,683 2,286,849 kWh $0.04
Electricity Demand $66,398 5,388 kW-months/year $12.32
Electricity Fees $21,150 - $ -
Natural Gas $123,142 12,210 MMBtu $10.09
TOTAL ENERGY COSTS $319,570
RECOMMENDED SAVINGS* $158,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $146,542
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,316
Cost:
$1,400
$1,296 33,181 $1,020 82 - - - - - - $1,296
33,181
kWh
$1,020
82
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,674
Cost:
$27,188
$2,740 70,258 $1,020 174 $106 - - - $808 - $2,740
70,258
kWh
$1,020
174
kW-months/year
$106
-
$
-
-
$
$808
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,438
Cost:
$1,225
$2,108 54,047 $330 27 - - - - - - $2,108
54,047
kWh
$330
27
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,602
Cost:
$25,370
$3,868 99,167 $3,026 246 $(-250) - - - $(-42) - $3,868
99,167
kWh
$3,026
246
kW-months/year
$(-250)
-
$
-
-
$
$(-42)
-
$
05: 4.426 MODIFY WORKLOAD Savings:
$132,950
Cost:
$36,600
- - - - $78,500 - $54,450 - - - -
-
kWh
-
-
kW-months/year
$78,500
-
$
$54,450
-
$
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$9,840
Cost:
$250
- - - - $9,840 - - - - - -
-
kWh
-
-
kW-months/year
$9,840
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$158,820
Cost:
$92,033
$10,012 256,653 $5,396 529 $88,196 - $54,450 - $766 - $10,012
256,653
kWh
$5,396
529
kW-months/year
$88,196
-
$
$54,450
-
$
$766
-
$
TOTAL IMPLEMENTED Savings:
$146,542
Cost:
$90,558
$7,904 202,606 $5,066 502 $78,356 - $54,450 - $766 - $7,904
202,606
kWh
$5,066
502
kW-months/year
$78,356
-
$
$54,450
-
$
$766
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $