IAC logo
IAC Assessment: IC0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Street Sweepers
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $100,000,000-$500,000,000
# of Employees 375
Plant Area (Sq.Ft.) 300,000
Annual Production 950 Pieces
Production Hrs. Annual 5,610
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,112 5,268,366 kWh $0.04
Electricity Demand $141,368 12,054 kW-months/year $11.73
Electricity Fees $26,251 - $ -
Natural Gas $341,948 44,082 MMBtu $7.76
TOTAL ENERGY COSTS $708,472
RECOMMENDED SAVINGS* $114,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,996
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,405
Cost:
$97,350
$16,640 396,178 $9,940 847 - - $(-1,527) - - - $(-648) - - - $16,640
396,178
kWh
$9,940
847
kW-months/year
-
-
MMBtu
$(-1,527)
-
$
-
-
$
$(-648)
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,622
Cost:
$5,604
$918 21,861 $549 47 - - $10 - - - $145 - - - $918
21,861
kWh
$549
47
kW-months/year
-
-
MMBtu
$10
-
$
-
-
$
$145
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,219
Cost:
$1,700
$1,389 33,043 $1,830 156 - - - - - - - - - - $1,389
33,043
kWh
$1,830
156
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$11,179
Cost:
$15,000
- - - - $11,179 1,441 - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,179
1,441
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$13,369
Cost:
$27,400
- - - - $13,369 1,953 - - - - - - - - -
-
kWh
-
-
kW-months/year
$13,369
1,953
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
06: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$43,200
Cost:
$8,500
- - - - - - - - $43,200 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$43,200
-
$
-
-
$
-
-
$
07: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$10,750
Cost:
$22,000
- - - - - - - - - - $10,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$10,750
-
$
-
-
$
08: 3.1181 ELIMINATE A BY-PRODUCT Savings:
$6,316
Cost:
$72,000
- - - - - - - - - - - - $6,316 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$6,316
-
$
TOTAL RECOMMENDED Savings:
$114,060
Cost:
$249,554
$18,947 451,082 $12,319 1,050 $24,548 3,394 $(-1,517) - $43,200 - $10,247 - $6,316 - $18,947
451,082
kWh
$12,319
1,050
kW-months/year
$24,548
3,394
MMBtu
$(-1,517)
-
$
$43,200
-
$
$10,247
-
$
$6,316
-
$
TOTAL IMPLEMENTED Savings:
$39,996
Cost:
$126,654
$18,947 451,082 $12,319 1,050 - - $(-1,517) - - - $10,247 - - - $18,947
451,082
kWh
$12,319
1,050
kW-months/year
-
-
MMBtu
$(-1,517)
-
$
-
-
$
$10,247
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost By-product Production