IAC logo
IAC Assessment: IC0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Extruded Aluminum Parts
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 155,000
Annual Production 30,797,532 Pounds
Production Hrs. Annual 7,038
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $574,016 10,972,000 kWh $0.05
Electricity Demand $229,538 22,861 kW-months/year $10.04
Natural Gas $444,664 63,257 MMBtu $7.03
TOTAL ENERGY COSTS $583,088
RECOMMENDED SAVINGS* $374,027 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $203,980
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,248
Cost:
$47,200
$12,060 268,007 $4,511 457 - - - - $(-929) - - - $(-394) - - - $12,060
268,007
kWh
$4,511
457
kW-months/year
-
-
MMBtu
-
-
lb
$(-929)
-
$
-
-
$
$(-394)
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,379
Cost:
$23,767
$5,385 119,668 $1,998 202 - - - - $314 - - - $682 - - - $5,385
119,668
kWh
$1,998
202
kW-months/year
-
-
MMBtu
-
-
lb
$314
-
$
-
-
$
$682
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,978
Cost:
$3,100
$10,174 226,080 $3,804 386 - - - - - - - - - - - - $10,174
226,080
kWh
$3,804
386
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,817
Cost:
-
$1,323 29,402 $494 50 - - - - - - - - - - - - $1,323
29,402
kWh
$494
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,341
Cost:
-
$3,848 85,512 $1,493 146 - - - - - - - - - - - - $3,848
85,512
kWh
$1,493
146
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,923
Cost:
$5,500
$2,581 57,352 $1,342 136 - - - - - - - - - - - - $2,581
57,352
kWh
$1,342
136
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
07: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,651
Cost:
$2,640
- - - - $10,651 1,515 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,651
1,515
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
08: 2.2514 COVER OPEN TANKS Savings:
$18,222
Cost:
$3,181
- - - - $18,222 2,592 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$18,222
2,592
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,281
Cost:
$756
- - - - $1,281 182 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,281
182
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,271
Cost:
$7,328
- - - - $2,271 323 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,271
323
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,938
Cost:
$7,035
- - - - $10,938 1,556 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,938
1,556
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,981
Cost:
$2,477
- - - - $2,981 424 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,981
424
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
13: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,761
Cost:
$8,173
- - - - $3,761 535 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,761
535
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
14: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$471
Cost:
$225
- - - - $471 67 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$471
67
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
15: 3.1242 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT Savings:
$10,813
Cost:
-
- - - - - - - - - - - - $10,813 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$10,813
-
$
-
-
Tgal
16: 3.7197 USE ULTRASONIC CLEANING Savings:
$21,427
Cost:
$33,000
- - - - - - $4,800 - - - - - $16,536 - $91 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,800
-
lb
-
-
$
-
-
$
$16,536
-
$
$91
-
Tgal
17: 3.7224 USE PUMPS AND PIPING TO DECREASE THE FREQUENCY OF SPILLAGE DURING MATERIAL TRANSFER Savings:
$81,120
Cost:
$370,000
- - - - - - - - - - - - $81,120 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$81,120
-
$
-
-
Tgal
18: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$97,419
Cost:
$9,377
- - - - - - - - $35,301 - $62,118 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$35,301
-
$
$62,118
-
$
-
-
$
-
-
Tgal
19: 4.4260 MODIFY WORKLOAD Savings:
$63,986
Cost:
$46,300
- - - - - - - - - - $63,986 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$63,986
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$374,027
Cost:
$570,059
$35,371 786,021 $13,642 1,377 $50,576 7,194 $4,800 - $34,686 - $126,104 - $108,757 - $91 - $35,371
786,021
kWh
$13,642
1,377
kW-months/year
$50,576
7,194
MMBtu
$4,800
-
lb
$34,686
-
$
$126,104
-
$
$108,757
-
$
$91
-
Tgal
TOTAL IMPLEMENTED Savings:
$203,980
Cost:
$398,007
$14,078 312,834 $5,640 572 $5,723 814 - - $35,301 - $62,118 - $81,120 - - - $14,078
312,834
kWh
$5,640
572
kW-months/year
$5,723
814
MMBtu
-
-
lb
$35,301
-
$
$62,118
-
$
$81,120
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption