IAC logo
IAC Assessment: IC0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Disposable Plastic Food Packaging
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 180,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,265 7,741,659 kWh $0.05
Electricity Demand $65,853 18,343 kW-months/year $3.59
Electricity Fees $55,974 - $ -
Natural Gas $31,018 6,431 MMBtu $4.82
TOTAL ENERGY COSTS $633,683
RECOMMENDED SAVINGS* $143,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,410
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$700
Cost:
$578
$461 8,226 $176 49 $12 - - - $51 - $461
8,226
kWh
$176
49
kW-months/year
$12
-
$
-
-
$
$51
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,789
Cost:
$81,125
$21,112 376,992 $2,654 739 $(-1,388) - - - $(-589) - $21,112
376,992
kWh
$2,654
739
kW-months/year
$(-1,388)
-
$
-
-
$
$(-589)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$117
Cost:
$1,822
$84 1,499 $10 3 - - - - $23 - $84
1,499
kWh
$10
3
kW-months/year
-
-
$
-
-
$
$23
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$705
Cost:
$783
$683 12,207 $22 6 - - - - - - $683
12,207
kWh
$22
6
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$965
Cost:
$1,169
$336 5,992 $29 8 $240 - - - $360 - $336
5,992
kWh
$29
8
kW-months/year
$240
-
$
-
-
$
$360
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,481
Cost:
$3,120
$3,624 64,725 $857 239 - - - - - - $3,624
64,725
kWh
$857
239
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,358
Cost:
$26,100
$13,643 243,619 $1,715 478 - - - - - - $13,643
243,619
kWh
$1,715
478
kW-months/year
-
-
$
-
-
$
-
-
$
08: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$98,945
Cost:
$37,525
- - - - $38,703 - $60,242 - - - -
-
kWh
-
-
kW-months/year
$38,703
-
$
$60,242
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$143,060
Cost:
$152,222
$39,943 713,260 $5,463 1,522 $37,567 - $60,242 - $(-155) - $39,943
713,260
kWh
$5,463
1,522
kW-months/year
$37,567
-
$
$60,242
-
$
$(-155)
-
$
TOTAL IMPLEMENTED Savings:
$43,410
Cost:
$113,914
$39,260 701,053 $5,441 1,516 $(-1,136) - - - $(-155) - $39,260
701,053
kWh
$5,441
1,516
kW-months/year
$(-1,136)
-
$
-
-
$
$(-155)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost