IAC Assessment: IC0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2003
Principal Product Corrugated Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 160,000
Annual Production 60,000 Tons
Production Hrs. Annual 6,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $330,824 5,185,689 kWh $0.06
Electricity Demand $37,451 10,432 kW-months/year $3.59
Electricity Fees $2,832 - $ -
Natural Gas $185,449 58,666 MMBtu $3.16
TOTAL ENERGY COSTS $581,423
RECOMMENDED SAVINGS* $91,418 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,132
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,456
Cost:
$1,743
- - - - $4,456 1,410 - - - - - - -
-
kWh
-
-
kW-months/year
$4,456
1,410
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,894
Cost:
$969
$1,719 26,861 $175 49 - - - - - - - - $1,719
26,861
kWh
$175
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$997
Cost:
-
$905 14,142 $92 26 - - - - - - - - $905
14,142
kWh
$92
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,795
Cost:
$76,995
$26,239 409,979 $2,676 745 - - $(-517) - - - $(-603) - $26,239
409,979
kWh
$2,676
745
kW-months/year
-
-
MMBtu
$(-517)
-
$
-
-
$
$(-603)
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,508
Cost:
$3,420
- - - - $2,508 794 - - - - - - -
-
kWh
-
-
kW-months/year
$2,508
794
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,733
Cost:
$2,471
- - - - $1,733 548 - - - - - - -
-
kWh
-
-
kW-months/year
$1,733
548
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$15,702
Cost:
$56,250
- - - - $15,702 4,975 - - - - - - -
-
kWh
-
-
kW-months/year
$15,702
4,975
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$8,870
Cost:
$68,320
- - - - $8,870 2,807 - - - - - - -
-
kWh
-
-
kW-months/year
$8,870
2,807
MMBtu
-
-
$
-
-
$
-
-
$
09: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$27,463
Cost:
$4,684
- - - - - - $9,802 - $17,661 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,802
-
$
$17,661
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,418
Cost:
$214,852
$28,863 450,982 $2,943 820 $33,269 10,534 $9,285 - $17,661 - $(-603) - $28,863
450,982
kWh
$2,943
820
kW-months/year
$33,269
10,534
MMBtu
$9,285
-
$
$17,661
-
$
$(-603)
-
$
TOTAL IMPLEMENTED Savings:
$7,132
Cost:
$6,860
$2,624 41,003 $267 75 $4,241 1,342 - - - - - - $2,624
41,003
kWh
$267
75
kW-months/year
$4,241
1,342
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost