IAC Assessment: IC0081
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0081
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2004
Principal Product Prepared Metal Products
NAICS 311613 - Rendering and Meat Byproduct Processing
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 53,860
Annual Production 18,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,007 3,410,412 kWh $0.04
Electricity Demand $26,396 6,959 kW-months/year $3.79
Electricity Fees $23,854 - $ -
Natural Gas $26,250 3,722 MMBtu $7.05
TOTAL ENERGY COSTS $209,507
RECOMMENDED SAVINGS* $24,781 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,036
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$599
Cost:
-
- - - - $599 86 - - - - -
-
kWh
-
-
kW-months/year
$599
86
MMBtu
-
-
$
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,895
Cost:
$159
- - - - $2,895 416 - - - - -
-
kWh
-
-
kW-months/year
$2,895
416
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,195
Cost:
$600
$1,076 16,292 $119 31 - - - - - - $1,076
16,292
kWh
$119
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$347
Cost:
-
$313 4,742 $34 9 - - - - - - $313
4,742
kWh
$34
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$411
Cost:
$2,300
$411 6,002 - - - - - - - - $411
6,002
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,022
Cost:
$22,332
$6,386 96,434 $826 217 - - $410 - $400 - $6,386
96,434
kWh
$826
217
kW-months/year
-
-
MMBtu
$410
-
$
$400
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,098
Cost:
$23,216
$3,192 48,354 $352 93 - - $209 - $345 - $3,192
48,354
kWh
$352
93
kW-months/year
-
-
MMBtu
$209
-
$
$345
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$6,675
Cost:
$6,231
$6,517 98,748 $158 42 - - - - - - $6,517
98,748
kWh
$158
42
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$539
Cost:
$199
$116 1,712 $9 2 - - $109 - $305 - $116
1,712
kWh
$9
2
kW-months/year
-
-
MMBtu
$109
-
$
$305
-
$
TOTAL RECOMMENDED Savings:
$24,781
Cost:
$55,037
$18,011 272,284 $1,498 394 $3,494 502 $728 - $1,050 - $18,011
272,284
kWh
$1,498
394
kW-months/year
$3,494
502
MMBtu
$728
-
$
$1,050
-
$
TOTAL IMPLEMENTED Savings:
$5,036
Cost:
$759
$1,389 21,034 $153 40 $3,494 502 - - - - $1,389
21,034
kWh
$153
40
kW-months/year
$3,494
502
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes