IAC logo
IAC Assessment: IC0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2004
Principal Product Finished Metal Parts
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 51,000
Annual Production 2,500,000 Thousand Feet
Production Hrs. Annual 6,072
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,156 2,188,678 kWh $0.03
Electricity Demand $64,927 6,980 kW-months/year $9.30
Electricity Fees $20,740 - $ -
Natural Gas $185,245 25,425 MMBtu $7.29
TOTAL ENERGY COSTS $329,068
RECOMMENDED SAVINGS* $38,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,453
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$31,787
Cost:
$32,056
$(-727) 20,767 $(-347) 38 - - - - - - $32,861 - $(-727)
20,767
kWh
$(-347)
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$32,861
-
Tgal
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,453
Cost:
$2,048
- - - - $2,453 368 - - - - - - -
-
kWh
-
-
kW-months/year
$2,453
368
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$239
Cost:
$508
$48 1,376 $17 2 - - $72 - $102 - - - $48
1,376
kWh
$17
2
kW-months/year
-
-
MMBtu
$72
-
$
$102
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,166
Cost:
$18,190
$1,257 35,903 $793 88 - - $1,677 - $439 - - - $1,257
35,903
kWh
$793
88
kW-months/year
-
-
MMBtu
$1,677
-
$
$439
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$38,645
Cost:
$52,802
$578 58,046 $463 127 $2,453 368 $1,749 - $541 - $32,861 - $578
58,046
kWh
$463
127
kW-months/year
$2,453
368
MMBtu
$1,749
-
$
$541
-
$
$32,861
-
Tgal
TOTAL IMPLEMENTED Savings:
$2,453
Cost:
$2,048
- - - - $2,453 368 - - - - - - -
-
kWh
-
-
kW-months/year
$2,453
368
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal