IAC logo
IAC Assessment: IC0094
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0094
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2005
Principal Product Stainless Steel Tubing
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 185,000
Annual Production 40,000 Thousand Feet
Production Hrs. Annual 8,424
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $483,036 14,467,200 kWh $0.03
Electricity Demand $319,690 32,510 kW-months/year $9.83
Electricity Fees $51,030 - $ -
Natural Gas $80,321 9,125 MMBtu $8.80
TOTAL ENERGY COSTS $934,077
RECOMMENDED SAVINGS* $71,564 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,060
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$28,301
Cost:
$54,519
$(-1,972) (-54,765) $(-697) (-72) $30,970 3,663 $(-1,972)
(-54,765)
kWh
$(-697)
(-72)
kW-months/year
$30,970
3,663
MMBtu
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,962
Cost:
$6,778
$1,449 51,012 $513 53 - - $1,449
51,012
kWh
$513
53
kW-months/year
-
-
MMBtu
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$24,437
Cost:
$32,056
$17,354 480,061 $7,083 660 - - $17,354
480,061
kWh
$7,083
660
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,623
Cost:
$3,900
$6,660 184,921 $2,963 306 - - $6,660
184,921
kWh
$2,963
306
kW-months/year
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$992
Cost:
$890
$421 11,717 $571 59 - - $421
11,717
kWh
$571
59
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,200
Cost:
-
$832 23,124 $368 38 - - $832
23,124
kWh
$368
38
kW-months/year
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,655
Cost:
$2,640
$487 13,518 $2,168 224 - - $487
13,518
kWh
$2,168
224
kW-months/year
-
-
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,394
Cost:
$5,123
$1,657 45,999 $737 76 - - $1,657
45,999
kWh
$737
76
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$71,564
Cost:
$105,906
$26,888 755,587 $13,706 1,344 $30,970 3,663 $26,888
755,587
kWh
$13,706
1,344
kW-months/year
$30,970
3,663
MMBtu
TOTAL IMPLEMENTED Savings:
$34,060
Cost:
$35,956
$24,014 664,982 $10,046 966 - - $24,014
664,982
kWh
$10,046
966
kW-months/year
-
-
MMBtu
Savings