Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2006 |
Principal Product | precipated silica |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 77,161,792 Pounds |
Production Hrs. Annual | 8,520 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $715,624 | 12,216,000 | kWh | $0.06 |
Natural Gas | $2,217,117 | 344,493 | MMBtu | $6.44 |
TOTAL ENERGY COSTS | $2,932,741 | |||
RECOMMENDED SAVINGS* | $533,760 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $162,118 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Raw Material | Water Consumption | Electricity Usage | Natural Gas | Primary Raw Material | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1224 REPLACE BOILER |
Savings: $300,562 Cost: $414,240 |
- | - | $(-1,122,948) | (-174,371) | $1,475,752 | - | $(-52,242) | - |
- - kWh |
$(-1,122,948) (-174,371) MMBtu |
$1,475,752 - $ |
$(-52,242) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $57,168 Cost: $11,016 |
- | - | - | - | $57,168 | - | - | - |
- - kWh |
- - MMBtu |
$57,168 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS |
Savings: $44,296 Cost: $145,126 |
- | - | $(-49,627) | (-7,706) | $93,923 | - | - | - |
- - kWh |
$(-49,627) (-7,706) MMBtu |
$93,923 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $42,495 Cost: $66,129 |
$42,495 | 720,258 | - | - | - | - | - | - |
$42,495 720,258 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $28,585 Cost: $165,480 |
$(-15,857) | (-268,777) | $44,442 | 6,901 | - | - | - | - |
$(-15,857) (-268,777) kWh |
$44,442 6,901 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $48,787 Cost: $157,465 |
$48,787 | 827,135 | - | - | - | - | - | - |
$48,787 827,135 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,753 Cost: $2,300 |
$8,753 | 148,356 | - | - | - | - | - | - |
$8,753 148,356 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,114 Cost: - |
$3,114 | 52,778 | - | - | - | - | - | - |
$3,114 52,778 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $533,760 Cost: $961,756 |
$87,292 | 1,479,750 | $(-1,128,133) | (-175,176) | $1,626,843 | - | $(-52,242) | - | $87,292 1,479,750 kWh |
$(-1,128,133) (-175,176) MMBtu |
$1,626,843 - $ |
$(-52,242) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $162,118 Cost: $315,907 |
$60,654 | 1,028,269 | $(-49,627) | (-7,706) | $151,091 | - | - | - | $60,654 1,028,269 kWh |
$(-49,627) (-7,706) MMBtu |
$151,091 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Raw Material | Water Consumption | Electricity Usage | Natural Gas | Primary Raw Material | Water Consumption |