Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2006 |
Principal Product | door modules |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3429 - Hardware, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 142 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 1,077,600 Pieces |
Production Hrs. Annual | 4,144 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $46,048 | 981,021 | kWh | $0.05 |
Electricity Demand | $29,287 | 2,393 | kW-months/year | $12.24 |
Electricity Fees | $240 | - | $ | - |
Natural Gas | $96,202 | 8,063 | MMBtu | $11.93 |
TOTAL ENERGY COSTS | $171,777 | |||
RECOMMENDED SAVINGS* | $26,784 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,165 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,603 Cost: $6,000 |
- | - | - | - | $3,603 | 302 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,603 302 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,321 Cost: $1,100 |
$2,468 | 52,560 | $853 | 70 | - | - | - | - | - | - |
$2,468 52,560 kWh |
$853 70 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $294 Cost: - |
$221 | 4,703 | $73 | 6 | - | - | - | - | - | - |
$221 4,703 kWh |
$73 6 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $15,127 Cost: $218 |
- | - | - | - | $15,127 | 1,268 | - | - | - | - |
- - kWh |
- - kW-months/year |
$15,127 1,268 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $4,114 Cost: - |
- | - | - | - | $4,114 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,114 - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $325 Cost: $274 |
$161 | 3,416 | $61 | 5 | - | - | $53 | - | $50 | - |
$161 3,416 kWh |
$61 5 kW-months/year |
- - MMBtu |
$53 - $ |
$50 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,784 Cost: $7,592 |
$2,850 | 60,679 | $987 | 81 | $22,844 | 1,570 | $53 | - | $50 | - | $2,850 60,679 kWh |
$987 81 kW-months/year |
$22,844 1,570 MMBtu |
$53 - $ |
$50 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,165 Cost: $7,318 |
$2,468 | 52,560 | $853 | 70 | $22,844 | 1,570 | - | - | - | - | $2,468 52,560 kWh |
$853 70 kW-months/year |
$22,844 1,570 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |