IAC Assessment: IC0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2006
Principal Product Air-Cooled Evaporators
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $100,000,000-$500,000,000
# of Employees 215
Plant Area (Sq.Ft.) 283,504
Annual Production 100,000 Pieces
Production Hrs. Annual 7,324
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,124 4,130,412 kWh $0.07
Electricity Demand $40,915 9,525 kW-months/year $4.30
Electricity Fees $2,207 - $ -
Natural Gas $100,733 10,313 MMBtu $9.77
TOTAL ENERGY COSTS $455,357
RECOMMENDED SAVINGS* $128,931 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,707
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61,122
Cost:
$180,000
$53,612 788,414 $5,556 1,292 - - $(-2,294) - $4,248 - $53,612
788,414
kWh
$5,556
1,292
kW-months/year
-
-
MMBtu
$(-2,294)
-
$
$4,248
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,585
Cost:
$53,959
$6,473 95,198 $1,027 237 - - $329 - $756 - $6,473
95,198
kWh
$1,027
237
kW-months/year
-
-
MMBtu
$329
-
$
$756
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,649
Cost:
$1,500
$2,649 38,999 - - - - - - - - $2,649
38,999
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,565
Cost:
-
- - - - $6,565 672 - - - - -
-
kWh
-
-
kW-months/year
$6,565
672
MMBtu
-
-
$
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$44,224
Cost:
$56,250
$9,515 139,929 $3,509 816 - - - - $31,200 - $9,515
139,929
kWh
$3,509
816
kW-months/year
-
-
MMBtu
-
-
$
$31,200
-
$
06: 2.1224 REPLACE BOILER Savings:
$4,755
Cost:
$27,175
- - - - $2,755 282 $2,000 - - - -
-
kWh
-
-
kW-months/year
$2,755
282
MMBtu
$2,000
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,031
Cost:
-
$911 13,400 $120 28 - - - - - - $911
13,400
kWh
$120
28
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$128,931
Cost:
$318,884
$73,160 1,075,940 $10,212 2,373 $9,320 954 $35 - $36,204 - $73,160
1,075,940
kWh
$10,212
2,373
kW-months/year
$9,320
954
MMBtu
$35
-
$
$36,204
-
$
TOTAL IMPLEMENTED Savings:
$69,707
Cost:
$233,959
$60,085 883,612 $6,583 1,529 - - $(-1,965) - $5,004 - $60,085
883,612
kWh
$6,583
1,529
kW-months/year
-
-
MMBtu
$(-1,965)
-
$
$5,004
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost