IAC logo
IAC Assessment: IC0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2009
Principal Product Toaster Pastries and Baked Goods
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $5,000,000-$10,000,000
# of Employees 300
Plant Area (Sq.Ft.) 311,300
Annual Production 86,950,000 Pounds
Production Hrs. Annual 6,808
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $829,890 10,920,301 kWh $0.08
Electricity Demand $118,152 21,993 kW-months/year $5.37
Natural Gas $912,152 193,754 MMBtu $4.71
TOTAL ENERGY COSTS $1,896,217
RECOMMENDED SAVINGS* $54,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,693
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$10,860
Cost:
$8,096
$9,898 130,237 $962 178 - - $9,898
130,237
kWh
$962
178
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,252
Cost:
$4,247
$3,786 49,820 $466 87 - - $3,786
49,820
kWh
$466
87
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,116
Cost:
$1,649
$906 11,908 $210 39 - - $906
11,908
kWh
$210
39
kW-months/year
-
-
MMBtu
04: 2.7122 DISCONNECT BALLASTS Savings:
$2,089
Cost:
$2,200
$1,858 24,444 $231 43 - - $1,858
24,444
kWh
$231
43
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,483
Cost:
$29,250
$12,808 168,519 $1,675 312 - - $12,808
168,519
kWh
$1,675
312
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,309
Cost:
$5,917
$1,191 16,320 $118 22 - - $1,191
16,320
kWh
$118
22
kW-months/year
-
-
MMBtu
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,792
Cost:
$15,044
$4,261 56,054 $531 99 - - $4,261
56,054
kWh
$531
99
kW-months/year
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,513
Cost:
$1,610
$3,513 44,694 - - - - $3,513
44,694
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,278
Cost:
$7,995
$8,278 108,928 - - - - $8,278
108,928
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$934
Cost:
-
$547 7,200 $387 72 - - $547
7,200
kWh
$387
72
kW-months/year
-
-
MMBtu
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,559
Cost:
$2,887
- - - - $1,559 359 -
-
kWh
-
-
kW-months/year
$1,559
359
MMBtu
12: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,299
Cost:
-
- - - - $1,299 155 -
-
kWh
-
-
kW-months/year
$1,299
155
MMBtu
TOTAL RECOMMENDED Savings:
$54,484
Cost:
$78,895
$47,046 618,124 $4,580 852 $2,858 514 $47,046
618,124
kWh
$4,580
852
kW-months/year
$2,858
514
MMBtu
TOTAL IMPLEMENTED Savings:
$42,693
Cost:
$69,290
$35,255 464,502 $4,580 852 $2,858 514 $35,255
464,502
kWh
$4,580
852
kW-months/year
$2,858
514
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas