IAC logo
IAC Assessment: IC0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2010
Principal Product frozen pizza
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 150,000
Annual Production 50,000,000 Units
Production Hrs. Annual 7,764
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $620,977 8,812,068 kWh $0.07
Electricity Demand $86,906 15,528 kW-months/year $5.60
Natural Gas $74,819 10,149 MMBtu $7.37
Other Gas $3,300,000 1,726 MMBtu $1,912.05
TOTAL ENERGY COSTS $4,152,223
RECOMMENDED SAVINGS* $3,169,851 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $115
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$115
Cost:
-
$67 959 $20 4 - - $40 - $(-12) - $67
959
kWh
$20
4
kW-months/year
-
-
MMBtu
$40
-
$
$(-12)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,201
Cost:
-
$1,218 17,386 $278 49 - - $528 - $177 - $1,218
17,386
kWh
$278
49
kW-months/year
-
-
MMBtu
$528
-
$
$177
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,944
Cost:
$360
$1,725 24,645 $219 39 - - - - - - $1,725
24,645
kWh
$219
39
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$562
Cost:
-
$562 8,030 - - - - - - - - $562
8,030
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,411
Cost:
$940
$2,411 34,439 - - - - - - - - $2,411
34,439
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$613
Cost:
$1,248
$613 8,760 - - - - - - - - $613
8,760
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,978
Cost:
$72
$310 4,441 $68 49 $1,600 217 - - - - $310
4,441
kWh
$68
49
kW-months/year
$1,600
217
MMBtu
-
-
$
-
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,552
Cost:
-
- - - - $3,552 482 - - - - -
-
kWh
-
-
kW-months/year
$3,552
482
MMBtu
-
-
$
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,810
Cost:
-
$9,600 137,147 $1,210 216 - - - - - - $9,600
137,147
kWh
$1,210
216
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$490
Cost:
-
- - - - $490 67 - - - - -
-
kWh
-
-
kW-months/year
$490
67
MMBtu
-
-
$
-
-
$
11: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,144,671
Cost:
$1,170,000
$(-182,905) (-26,012,933) $(-20,046) (-298) - - $(-51,000) - $3,398,622 - $(-182,905)
(-26,012,933)
kWh
$(-20,046)
(-298)
kW-months/year
-
-
MMBtu
$(-51,000)
-
$
$3,398,622
-
$
12: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$504
Cost:
-
$504 7,200 - - - - - - - - $504
7,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$3,169,851
Cost:
$1,172,620
$(-165,895) (-25,769,926) $(-18,251) 59 $5,642 766 $(-50,432) - $3,398,787 - $(-165,895)
(-25,769,926)
kWh
$(-18,251)
59
kW-months/year
$5,642
766
MMBtu
$(-50,432)
-
$
$3,398,787
-
$
TOTAL IMPLEMENTED Savings:
$115
Cost:
-
$67 959 $20 4 - - $40 - $(-12) - $67
959
kWh
$20
4
kW-months/year
-
-
MMBtu
$40
-
$
$(-12)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material