IAC Assessment: IC0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2010
Principal Product Corrugated Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 132,000
Annual Production 409,918 Thousand Feet
Production Hrs. Annual 4,352
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,205 1,017,000 kWh $0.10
Electricity Demand $87,966 6,732 kW-months/year $13.07
Natural Gas $15,018 1,750 MMBtu $8.58
TOTAL ENERGY COSTS $211,087
RECOMMENDED SAVINGS* $20,577 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,949
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$317
Cost:
$1,315
$188 3,120 $129 10 - - - - - - - - $188
3,120
kWh
$129
10
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,215
Cost:
$441
$361 3,508 $63 5 - - - - $256 - $535 - $361
3,508
kWh
$63
5
kW-months/year
-
-
MMBtu
-
-
MMBtu
$256
-
$
$535
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,067
Cost:
$1,035
$1,067 10,357 - - - - - - - - - - $1,067
10,357
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$880
Cost:
$519
$652 6,336 $228 17 - - - - - - - - $652
6,336
kWh
$228
17
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$858
Cost:
-
- - - - $858 100 - - - - - - -
-
kWh
-
-
kW-months/year
$858
100
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,358
Cost:
$5,900
$5,642 94,030 $2,771 244 $(-1,055) (-123) - - - - - - $5,642
94,030
kWh
$2,771
244
kW-months/year
$(-1,055)
(-123)
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$8,677
Cost:
$40,071
$(-917) (-15,276) $(-333) 29 - - $9,298 375 $629 - - - $(-917)
(-15,276)
kWh
$(-333)
29
kW-months/year
-
-
MMBtu
$9,298
375
MMBtu
$629
-
$
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$205
Cost:
-
$175 1,700 $30 2 - - - - - - - - $175
1,700
kWh
$30
2
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,577
Cost:
$49,281
$7,168 103,775 $2,888 307 $(-197) (-23) $9,298 375 $885 - $535 - $7,168
103,775
kWh
$2,888
307
kW-months/year
$(-197)
(-23)
MMBtu
$9,298
375
MMBtu
$885
-
$
$535
-
$
TOTAL IMPLEMENTED Savings:
$9,949
Cost:
$41,106
$325 (-3,219) $(-303) 31 - - $9,298 375 $629 - - - $325
(-3,219)
kWh
$(-303)
31
kW-months/year
-
-
MMBtu
$9,298
375
MMBtu
$629
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost