IAC Assessment: IC0183
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0183
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2011
Principal Product Food
NAICS 311211 - Flour Milling
SIC 2041 - Flour And Other Grain Mill Products
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 126,800
Annual Production 30,608,773 Pounds
Production Hrs. Annual 4,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,763 1,998,200 kWh $0.09
Electricity Demand $31,010 6,720 kW-months/year $4.61
Electricity Fees $2,700 - $ -
Natural Gas $1,504 181 MMBtu $8.31
TOTAL ENERGY COSTS $208,740
RECOMMENDED SAVINGS* $30,960 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,319
Cost:
-
$3,042 35,366 $404 88 - - - - $171 - $(-298) - $3,042
35,366
kWh
$404
88
kW-months/year
-
-
MMBtu
-
-
$
$171
-
$
$(-298)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$160
Cost:
$503
$144 1,680 $18 4 - - $2 - - - $(-4) - $144
1,680
kWh
$18
4
kW-months/year
-
-
MMBtu
$2
-
$
-
-
$
$(-4)
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$328
Cost:
$2,003
$271 3,152 $57 12 - - - - - - - - $271
3,152
kWh
$57
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,540
Cost:
$81,305
$12,793 148,760 $1,578 342 - - $246 - - - $(-77) - $12,793
148,760
kWh
$1,578
342
kW-months/year
-
-
MMBtu
$246
-
$
-
-
$
$(-77)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,481
Cost:
$43,841
$9,416 109,484 $1,161 252 - - $42 - - - $862 - $9,416
109,484
kWh
$1,161
252
kW-months/year
-
-
MMBtu
$42
-
$
-
-
$
$862
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$182
Cost:
$426
$145 1,682 $11 2 - - - - - - $26 - $145
1,682
kWh
$11
2
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$26
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$363
Cost:
-
$363 4,225 - - - - - - - - - - $363
4,225
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$570
Cost:
$1,035
$570 6,629 - - - - - - - - - - $570
6,629
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$17
Cost:
-
- - - - $17 2 - - - - - - -
-
kWh
-
-
kW-months/year
$17
2
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,960
Cost:
$129,113
$26,744 310,978 $3,229 701 $17 2 $290 - $171 - $509 - $26,744
310,978
kWh
$3,229
701
kW-months/year
$17
2
MMBtu
$290
-
$
$171
-
$
$509
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost