IAC logo
IAC Assessment: IC0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2017
Principal Product Driveline, Powertrain
NAICS 333517 - Machine Tool Manufacturing
SIC 3542 - Machine Tools, Metal Forming Types
Sales $500,000-$1,000,000
# of Employees 160
Plant Area (Sq.Ft.) 110,000
Annual Production 4,000,000 Units
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $451,377 7,399,622 kWh $0.06
Electricity Demand $102,695 14,993 kW-months/year $6.85
Natural Gas $11,769 2,616 MMBtu $4.50
TOTAL ENERGY COSTS $565,841
RECOMMENDED SAVINGS* $33,979 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,264
Cost:
$4,650
$17,015 278,933 $249 36 $17,015
278,933
kWh
$249
36
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,101
Cost:
$1,146
$3,101 50,836 - - $3,101
50,836
kWh
-
-
kW-months/year
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,964
Cost:
$3,000
$6,889 112,924 $1,075 155 $6,889
112,924
kWh
$1,075
155
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,064
Cost:
$50
$2,650 43,450 $414 60 $2,650
43,450
kWh
$414
60
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,586
Cost:
$4,651
$2,553 42,554 $33 5 $2,553
42,554
kWh
$33
5
kW-months/year
TOTAL RECOMMENDED Savings:
$33,979
Cost:
$13,497
$32,208 528,697 $1,771 255 $32,208
528,697
kWh
$1,771
255
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand