IAC logo
IAC Assessment: IC0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2019
Principal Product Food Packaging Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 71,920
Annual Production 6,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $523,530 5,816,998 kWh $0.09
Electricity Demand $111,103 26,390 kW-months/year $4.21
Natural Gas $12,491 2,070 MMBtu $6.03
TOTAL ENERGY COSTS $647,124
RECOMMENDED SAVINGS* $191,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$156,049
Cost:
$91,000
$189,783 2,108,700 $12,504 2,970 $(-46,238) (-7,668) $189,783
2,108,700
kWh
$12,504
2,970
kW-months/year
$(-46,238)
(-7,668)
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$15,726
Cost:
$8,414
$15,726 174,730 - - - - $15,726
174,730
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,962
Cost:
$2,550
$8,424 93,589 $538 128 - - $8,424
93,589
kWh
$538
128
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,892
Cost:
$3,797
$10,061 111,763 $831 198 - - $10,061
111,763
kWh
$831
198
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$191,628
Cost:
$105,761
$223,994 2,488,782 $13,872 3,296 $(-46,238) (-7,668) $223,994
2,488,782
kWh
$13,872
3,296
kW-months/year
$(-46,238)
(-7,668)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas