IAC logo
IAC Assessment: IC0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2019
Principal Product Architectural Glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 150,000
Annual Production 1,000,000 Units
Production Hrs. Annual 2,800
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,944 1,387,671 kWh $0.05
Electricity Demand $60,560 8,683 kW-months/year $6.97
Electricity Fees $38,583 - $ -
Natural Gas $75,517 10,676 MMBtu $7.07
TOTAL ENERGY COSTS $237,604
RECOMMENDED SAVINGS* $41,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,304
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,919
Cost:
$2,467
$1,166 25,687 $753 108 - - - - $1,166
25,687
kWh
$753
108
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$19,373
Cost:
$57,850
- - - - $19,373 2,740 - - -
-
kWh
-
-
kW-months/year
$19,373
2,740
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,406
Cost:
-
- - - - - - $6,406 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,406
-
$
04: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$1,174
Cost:
$5,784
- - - - $1,174 166 - - -
-
kWh
-
-
kW-months/year
$1,174
166
MMBtu
-
-
$
05: 2.1224 REPLACE BOILER Savings:
$11,695
Cost:
$66,600
- - - - $11,695 1,654 - - -
-
kWh
-
-
kW-months/year
$11,695
1,654
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$110
Cost:
-
$110 2,418 - - - - - - $110
2,418
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,156
Cost:
$171
$993 21,864 $163 23 - - - - $993
21,864
kWh
$163
23
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$41,833
Cost:
$132,872
$2,269 49,969 $916 131 $32,242 4,560 $6,406 - $2,269
49,969
kWh
$916
131
kW-months/year
$32,242
4,560
MMBtu
$6,406
-
$
TOTAL IMPLEMENTED Savings:
$21,304
Cost:
$74,851
$1,276 28,105 $753 108 $12,869 1,820 $6,406 - $1,276
28,105
kWh
$753
108
kW-months/year
$12,869
1,820
MMBtu
$6,406
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes