IAC logo
IAC Assessment: IC0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2019
Principal Product Electroplating, copper/nickel/chrome on steel, zinc and brass parts
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 168,000
Annual Production 40,000,000 Units
Production Hrs. Annual 5,824
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,197 2,961,834 kWh $0.08
Electricity Demand $29,554 8,061 kW-months/year $3.67
Electricity Fees $29,970 - $ -
Natural Gas $174,847 35,487 MMBtu $4.93
TOTAL ENERGY COSTS $478,569
RECOMMENDED SAVINGS* $24,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,221
Cost:
$800
$2,650 32,320 $571 156 - - $2,650
32,320
kWh
$571
156
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,441
Cost:
$1,500
$1,373 16,668 $68 18 - - $1,373
16,668
kWh
$68
18
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,117
Cost:
$7,146
$6,457 78,357 $661 180 - - $6,457
78,357
kWh
$661
180
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,978
Cost:
$9,600
$4,558 55,584 $420 115 - - $4,558
55,584
kWh
$420
115
kW-months/year
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,871
Cost:
$28,000
$17,996 218,400 $1,233 336 $(-11,358) (-2,305) $17,996
218,400
kWh
$1,233
336
kW-months/year
$(-11,358)
(-2,305)
MMBtu
TOTAL RECOMMENDED Savings:
$24,628
Cost:
$47,046
$33,034 401,329 $2,952 804 $(-11,358) (-2,305) $33,034
401,329
kWh
$2,952
804
kW-months/year
$(-11,358)
(-2,305)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas