Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: IC0227
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: IC0227
IAC Center University of Illinois, Chicago
Assessment Year 2019
Principal Product Electroplating, copper/nickel/chrome on steel, zinc and brass parts
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 168,000
Annual Production 40,000,000 Units
Production Hrs. Annual 5,824
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,197 2,961,834 kWh $0.08
Electricity Demand $29,554 8,061 kW/month $3.67
Electricity Fees $29,970 - $ -
Natural Gas $174,847 35,487 MMBtu $4.93
TOTAL ENERGY COSTS $478,569
RECOMMENDED SAVINGS* $24,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW/month $ MMBtu
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,221
Cost:
$800
$2,650 32,320 $571 156 - - $2,650
32,320
kWh
$571
156
kW/month
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,441
Cost:
$1,500
$1,373 16,668 $68 18 - - $1,373
16,668
kWh
$68
18
kW/month
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,117
Cost:
$7,146
$6,457 78,357 $661 180 - - $6,457
78,357
kWh
$661
180
kW/month
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,978
Cost:
$9,600
$4,558 55,584 $420 115 - - $4,558
55,584
kWh
$420
115
kW/month
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,871
Cost:
$28,000
$17,996 218,400 $1,233 336 $(-11,358) (-2,305) $17,996
218,400
kWh
$1,233
336
kW/month
$(-11,358)
(-2,305)
MMBtu
TOTAL RECOMMENDED Savings:
$24,628
Cost:
$47,046
$33,034 401,329 $2,952 804 $(-11,358) (-2,305) $33,034
401,329
kWh
$2,952
804
kW/month
$(-11,358)
(-2,305)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW/month
-
-
MMBtu
Savings
Cost
$ kWh $ kW/month $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas