Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2019 |
Principal Product | Specialty Chemicals; Aromatic Sulfonic Acids and Industrial Resins |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 64 |
Plant Area (Sq.Ft.) | 91,094 |
Annual Production | 91,094 Units |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $182,948 | 4,154,563 | kWh | $0.04 |
Electricity Demand | $75,015 | 9,015 | kW-months/year | $8.32 |
Electricity Fees | $38,053 | - | $ | - |
Natural Gas | $385,706 | 86,398 | MMBtu | $4.46 |
TOTAL ENERGY COSTS | $681,722 | |||
RECOMMENDED SAVINGS* | $61,332 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,540 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,396 Cost: $4,200 |
$1,024 | 23,275 | $372 | 45 | - | - |
$1,024 23,275 kWh |
$372 45 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,024 Cost: $1,131 |
- | - | - | - | $1,024 | 234 |
- - kWh |
- - kW-months/year |
$1,024 234 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,701 Cost: $2,326 |
$7,689 | 174,730 | $3,012 | 362 | - | - |
$7,689 174,730 kWh |
$3,012 362 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA |
Savings: $2,133 Cost: $2,010 |
- | - | - | - | $2,133 | 486 |
- - kWh |
- - kW-months/year |
$2,133 486 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2141 OPERATE DISTILLATION COLUMNS EFFICIENTLY |
Savings: $20,792 Cost: $12,047 |
- | - | - | - | $20,792 | 4,661 |
- - kWh |
- - kW-months/year |
$20,792 4,661 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $25,286 Cost: $15,316 |
$23,841 | 541,839 | $1,445 | 174 | - | - |
$23,841 541,839 kWh |
$1,445 174 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,332 Cost: $37,030 |
$32,554 | 739,844 | $4,829 | 580 | $23,949 | 5,381 | $32,554 739,844 kWh |
$4,829 580 kW-months/year |
$23,949 5,381 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,540 Cost: $24,983 |
$32,554 | 739,844 | $4,829 | 580 | $3,157 | 720 | $32,554 739,844 kWh |
$4,829 580 kW-months/year |
$3,157 720 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |