Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2020 |
Principal Product | Metal Beverage Cans |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 2,700,000 Units |
Production Hrs. Annual | 8,616 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,068,865 | 46,473,600 | kWh | $0.04 |
Electricity Demand | $1,655,776 | 69,199 | kW-months/year | $23.93 |
Natural Gas | $766,999 | 192,558 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $5,038,869 | |||
RECOMMENDED SAVINGS* | $295,596 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $220,967 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,837 Cost: $1,500 |
- | - | - | - | - | - | $5,837 | 1,467 |
- - kWh |
- - kW-months/year |
- - $ |
$5,837 1,467 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,781 Cost: $13,282 |
- | - | - | - | - | - | $7,781 | 1,955 |
- - kWh |
- - kW-months/year |
- - $ |
$7,781 1,955 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,524 Cost: $50 |
$7,923 | 176,057 | $601 | 25 | - | - | - | - |
$7,923 176,057 kWh |
$601 25 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $15,197 Cost: - |
- | - | - | - | $15,197 | - | - | - |
- - kWh |
- - kW-months/year |
$15,197 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $212,444 Cost: $108,320 |
$117,264 | 2,605,870 | $95,179 | 3,977 | - | - | - | - |
$117,264 2,605,870 kWh |
$95,179 3,977 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $45,814 Cost: $7,700 |
$39,420 | 876,000 | $28,716 | 1,200 | - | - | $(-22,322) | (-5,609) |
$39,420 876,000 kWh |
$28,716 1,200 kW-months/year |
- - $ |
$(-22,322) (-5,609) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $295,596 Cost: $130,852 |
$164,607 | 3,657,927 | $124,497 | 5,202 | $15,197 | - | $(-8,704) | (-2,187) | $164,607 3,657,927 kWh |
$124,497 5,202 kW-months/year |
$15,197 - $ |
$(-8,704) (-2,187) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $220,967 Cost: $108,370 |
$125,187 | 2,781,927 | $95,781 | 4,002 | - | - | - | - | $125,187 2,781,927 kWh |
$95,781 4,002 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |