Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2021
Principal Product Mechanical Power Transmission Products
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3568 - Power Transmission Equipment, Nec
Sales $1,000,000-$5,000,000
# of Employees 110
Plant Area (Sq.Ft.) 69,490
Annual Production 2,200,000 Units
Production Hrs. Annual 6,456
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,420 3,099,332 kWh $0.05
Electricity Demand $65,317 8,728 kW-months/year $7.48
Electricity Fees $38,559 - $ -
Natural Gas $40,555 5,369 MMBtu $7.55
TOTAL ENERGY COSTS $316,878
RECOMMENDED SAVINGS* $33,205 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,458
Cost:
$4,300
$3,900 72,227 $1,558 208 - - $3,900
72,227
kWh
$1,558
208
kW-months/year
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$433
Cost:
$214
$309 5,726 $124 17 - - $309
5,726
kWh
$124
17
kW-months/year
-
-
Tgal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20,948
Cost:
$40,000
$20,948 387,920 - - - - $20,948
387,920
kWh
-
-
kW-months/year
-
-
Tgal
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$3,527
Cost:
$1,200
- - - - $3,527 264 -
-
kWh
-
-
kW-months/year
$3,527
264
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,840
Cost:
$544
$2,264 41,921 $576 77 - - $2,264
41,921
kWh
$576
77
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$33,205
Cost:
$46,258
$27,421 507,794 $2,258 302 $3,527 264 $27,421
507,794
kWh
$2,258
302
kW-months/year
$3,527
264
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage