Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2021
Principal Product Tire Shredding Machinery
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 107,500
Annual Production 24 Units
Production Hrs. Annual 2,600
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,608 1,854,544 kWh $0.12
Electricity Demand $37,282 7,298 kW-months/year $5.11
Electricity Fees $27,927 - $ -
Natural Gas $30,152 5,251 MMBtu $5.74
TOTAL ENERGY COSTS $325,969
RECOMMENDED SAVINGS* $36,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,390
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,457
Cost:
$154
- - $5,457 396 -
-
kWh
$5,457
396
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,374
Cost:
$4,100
$7,653 58,417 $3,721 270 $7,653
58,417
kWh
$3,721
270
kW-months/year
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,949
Cost:
$440
$1,304 9,953 $645 47 $1,304
9,953
kWh
$645
47
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,062
Cost:
$18,089
$10,812 82,535 $5,250 381 $10,812
82,535
kWh
$5,250
381
kW-months/year
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,067
Cost:
-
- - $2,067 150 -
-
kWh
$2,067
150
kW-months/year
TOTAL RECOMMENDED Savings:
$36,909
Cost:
$22,783
$19,769 150,905 $17,140 1,244 $19,769
150,905
kWh
$17,140
1,244
kW-months/year
TOTAL IMPLEMENTED Savings:
$15,390
Cost:
$4,540
$8,957 68,370 $6,433 467 $8,957
68,370
kWh
$6,433
467
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand