IAC logo
IAC Assessment: IC0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2022
Principal Product Electrical Boxes
NAICS 335313 - Switchgear and Switchboard Apparatus Manufacturing
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $100,000,000-$500,000,000
# of Employees 670
Plant Area (Sq.Ft.) 360,000
Annual Production 1,560,000 Units
Production Hrs. Annual 7,696
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,343 11,845,840 kWh $0.04
Electricity Demand $136,480 22,516 kW-months/year $6.06
Natural Gas $360,393 83,295 MMBtu $4.33
TOTAL ENERGY COSTS $1,011,216
RECOMMENDED SAVINGS* $22,446 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,208
Cost:
$1,715
$1,032 18,770 $176 29 - - $1,032
18,770
kWh
$176
29
kW-months/year
-
-
MMBtu
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,139
Cost:
-
- - $3,139 518 - - -
-
kWh
$3,139
518
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,387
Cost:
$3,452
- - - - $2,387 555 -
-
kWh
-
-
kW-months/year
$2,387
555
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,800
Cost:
-
$3,376 61,440 $1,424 235 - - $3,376
61,440
kWh
$1,424
235
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$563
Cost:
$1,190
$563 10,244 - - - - $563
10,244
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,349
Cost:
$400
$8,832 160,573 $1,517 250 - - $8,832
160,573
kWh
$1,517
250
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,446
Cost:
$6,757
$13,803 251,027 $6,256 1,032 $2,387 555 $13,803
251,027
kWh
$6,256
1,032
kW-months/year
$2,387
555
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas