IAC Assessment: IC0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2022
Principal Product Livestock Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 31,250
Annual Production 18,000 Tons
Production Hrs. Annual 2,860
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,201 460,200 kWh $0.17
Electricity Fees $1,867 - $ -
Natural Gas $36,877 4,735 MMBtu $7.79
TOTAL ENERGY COSTS $118,945
RECOMMENDED SAVINGS* $21,462 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,462
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage
$ kWh $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,140
Cost:
$789
$1,140 6,402 - - - - $1,140
6,402
kWh
-
-
MMBtu
-
-
Tgal
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,207
Cost:
$360
- - $4,207 539 - - -
-
kWh
$4,207
539
MMBtu
-
-
Tgal
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,477
Cost:
$1,392
- - $2,477 318 - - -
-
kWh
$2,477
318
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,943
Cost:
$22,735
$12,943 74,387 - - - - $12,943
74,387
kWh
-
-
MMBtu
-
-
Tgal
05: 3.4155 METER WASTE WATER Savings:
$695
Cost:
$600
- - - - $695 64,591 -
-
kWh
-
-
MMBtu
$695
64,591
Tgal
TOTAL RECOMMENDED Savings:
$21,462
Cost:
$25,876
$14,083 80,789 $6,684 857 $695 64,591 $14,083
80,789
kWh
$6,684
857
MMBtu
$695
64,591
Tgal
TOTAL IMPLEMENTED Savings:
$21,462
Cost:
$25,876
$14,083 80,789 $6,684 857 $695 64,591 $14,083
80,789
kWh
$6,684
857
MMBtu
$695
64,591
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage