IAC logo
IAC Assessment: IC0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2023
Principal Product Water Soluble Film
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 89
Plant Area (Sq.Ft.) 100,000
Annual Production 7,416,350 Pounds
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,910 4,378,880 kWh $0.04
Electricity Demand $214,964 8,059 kW-months/year $26.67
Electricity Fees $127,049 - $ -
Natural Gas $904,639 125,797 MMBtu $7.19
TOTAL ENERGY COSTS $1,441,562
RECOMMENDED SAVINGS* $507,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,865
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,114
Cost:
$7,997
$2,238 49,732 $33,876 1,270 - - $2,238
49,732
kWh
$33,876
1,270
kW-months/year
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$83,404
Cost:
$10,984
- - - - $83,404 11,121 -
-
kWh
-
-
kW-months/year
$83,404
11,121
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$102,187
Cost:
$5,165
- - - - $102,187 13,625 -
-
kWh
-
-
kW-months/year
$102,187
13,625
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,347
Cost:
$3,405
- - - - $6,347 846 -
-
kWh
-
-
kW-months/year
$6,347
846
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,869
Cost:
$2,547
- - - - $1,869 204 -
-
kWh
-
-
kW-months/year
$1,869
204
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$23,020
Cost:
$4,424
- - - - $23,020 3,069 -
-
kWh
-
-
kW-months/year
$23,020
3,069
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,027
Cost:
$90
- - - - $12,027 1,604 -
-
kWh
-
-
kW-months/year
$12,027
1,604
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$992
Cost:
$1,773
$932 20,703 $60 2 - - $932
20,703
kWh
$60
2
kW-months/year
-
-
MMBtu
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$85,492
Cost:
$1,202,972
$64,237 1,427,494 $21,255 797 - - $64,237
1,427,494
kWh
$21,255
797
kW-months/year
-
-
MMBtu
10: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$155,920
Cost:
$1,014,736
$349,435 (-415,994) - - $(-193,515) (-25,802) $349,435
(-415,994)
kWh
-
-
kW-months/year
$(-193,515)
(-25,802)
MMBtu
TOTAL RECOMMENDED Savings:
$507,372
Cost:
$2,254,093
$416,842 1,081,935 $55,191 2,069 $35,339 4,667 $416,842
1,081,935
kWh
$55,191
2,069
kW-months/year
$35,339
4,667
MMBtu
TOTAL IMPLEMENTED Savings:
$125,865
Cost:
$22,386
$2,238 49,732 $33,876 1,270 $89,751 11,967 $2,238
49,732
kWh
$33,876
1,270
kW-months/year
$89,751
11,967
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas