IAC Assessment: IC0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2023
Principal Product Water Soluble Film
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales $100,000,000-$500,000,000
# of Employees 121
Plant Area (Sq.Ft.) 209,720
Annual Production 10,039 Tons
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $399,516 8,978,688 kWh $0.04
Electricity Demand $441,649 16,990 kW-months/year $25.99
Electricity Fees $236,394 - $ -
Natural Gas $1,750,283 264,824 MMBtu $6.61
TOTAL ENERGY COSTS $2,827,842
RECOMMENDED SAVINGS* $712,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,231
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$64,155
Cost:
$52,421
- - - - $64,155 9,721 -
-
kWh
-
-
kW-months/year
$64,155
9,721
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,585
Cost:
$3,405
- - - - $5,585 846 -
-
kWh
-
-
kW-months/year
$5,585
846
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,672
Cost:
$1,280
- - - - $8,672 1,314 -
-
kWh
-
-
kW-months/year
$8,672
1,314
MMBtu
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$6,360
Cost:
$36
- - - - $6,360 964 -
-
kWh
-
-
kW-months/year
$6,360
964
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$81,821
Cost:
$1,271,713
$63,621 1,413,792 $18,200 700 - - $63,621
1,413,792
kWh
$18,200
700
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,159
Cost:
$20,704
$21,079 468,420 $18,080 695 - - $21,079
468,420
kWh
$18,080
695
kW-months/year
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$104,870
Cost:
$6,974
- - - - $104,870 15,889 -
-
kWh
-
-
kW-months/year
$104,870
15,889
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,974
Cost:
$5,963
$1,656 36,792 $319 12 - - $1,656
36,792
kWh
$319
12
kW-months/year
-
-
MMBtu
09: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$7,769
Cost:
$36,842
- - - - $7,769 1,177 -
-
kWh
-
-
kW-months/year
$7,769
1,177
MMBtu
10: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$391,650
Cost:
$2,055,740
$748,683 (-860,557) - - $(-357,033) (-54,096) $748,683
(-860,557)
kWh
-
-
kW-months/year
$(-357,033)
(-54,096)
MMBtu
TOTAL RECOMMENDED Savings:
$712,015
Cost:
$3,455,078
$835,038 1,058,447 $36,599 1,408 $(-159,622) (-24,185) $835,038
1,058,447
kWh
$36,599
1,408
kW-months/year
$(-159,622)
(-24,185)
MMBtu
TOTAL IMPLEMENTED Savings:
$16,231
Cost:
$10,648
$1,656 36,792 $319 12 $14,257 2,160 $1,656
36,792
kWh
$319
12
kW-months/year
$14,257
2,160
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas