IAC logo
IAC Assessment: IC0295
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0295
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2024
Principal Product Metal Cans Ends
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 178
Plant Area (Sq.Ft.) 146,896
Annual Production 17,200,000,000 Units
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $962,938 21,559,824 kWh $0.04
Electricity Demand $888,009 33,356 kW-months/year $26.62
Electricity Fees $512,235 - $ -
Natural Gas $54,932 6,173 MMBtu $8.90
TOTAL ENERGY COSTS $2,418,114
RECOMMENDED SAVINGS* $66,574 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,690
Cost:
$3,413
$3,143 69,854 $2,547 96 - - $3,143
69,854
kWh
$2,547
96
kW-months/year
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,497
Cost:
$558
$2,885 64,130 $5,612 211 - - $2,885
64,130
kWh
$5,612
211
kW-months/year
-
-
MMBtu
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$13,248
Cost:
-
- - $13,248 498 - - -
-
kWh
$13,248
498
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,828
Cost:
$7,539
$5,981 132,914 $4,847 182 - - $5,981
132,914
kWh
$4,847
182
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,221
Cost:
$6,343
$6,198 137,736 $5,023 189 - - $6,198
137,736
kWh
$5,023
189
kW-months/year
-
-
MMBtu
06: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$16,247
Cost:
$16,893
$820 18,215 - - $15,427 1,733 $820
18,215
kWh
-
-
kW-months/year
$15,427
1,733
MMBtu
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$843
Cost:
$490
$843 18,739 - - - - $843
18,739
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$66,574
Cost:
$35,236
$19,870 441,589 $31,276 1,175 $15,427 1,733 $19,870
441,589
kWh
$31,276
1,175
kW-months/year
$15,427
1,733
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas