Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2024 |
Principal Product | Biosolids and Sludge |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | <$500,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 4,000,000 |
Annual Production | 11,630,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,859,642 | 95,968,800 | kWh | $0.02 |
Electricity Demand | $1,442,693 | 72,961 | kW-months/year | $19.77 |
Electricity Fees | $(-202,949) | - | $ | - |
Natural Gas | $1,392,367 | 262,287 | MMBtu | $5.31 |
TOTAL ENERGY COSTS | $4,491,753 | |||
RECOMMENDED SAVINGS* | $890,839 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $474,326 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,372 Cost: $2,712 |
$2,215 | 116,568 | $3,157 | 160 | - | - |
$2,215 116,568 kWh |
$3,157 160 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $23,893 Cost: $3,458 |
- | - | - | - | $23,893 | 4,500 |
- - kWh |
- - kW-months/year |
$23,893 4,500 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $554 Cost: $642 |
$229 | 12,042 | $325 | 16 | - | - |
$229 12,042 kWh |
$325 16 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $89,084 Cost: $34,144 |
- | - | - | - | $89,084 | 16,777 |
- - kWh |
- - kW-months/year |
$89,084 16,777 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $263,888 Cost: $200,000 |
- | - | - | - | $263,888 | 49,697 |
- - kWh |
- - kW-months/year |
$263,888 49,697 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $447,899 Cost: $23,503 |
- | - | - | - | $447,899 | 84,350 |
- - kWh |
- - kW-months/year |
$447,899 84,350 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,379 Cost: $8,310 |
$79 | 4,126 | $27 | 1 | $1,273 | 240 |
$79 4,126 kWh |
$27 1 kW-months/year |
$1,273 240 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,981 Cost: $847 |
- | - | - | - | $1,981 | 373 |
- - kWh |
- - kW-months/year |
$1,981 373 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $56,790 Cost: $31,894 |
$23,413 | 1,232,286 | $33,377 | 1,688 | - | - |
$23,413 1,232,286 kWh |
$33,377 1,688 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $890,839 Cost: $305,510 |
$25,936 | 1,365,022 | $36,885 | 1,865 | $828,018 | 155,936 | $25,936 1,365,022 kWh |
$36,885 1,865 kW-months/year |
$828,018 155,936 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $474,326 Cost: $28,450 |
$229 | 12,042 | $325 | 16 | $473,773 | 89,223 | $229 12,042 kWh |
$325 16 kW-months/year |
$473,773 89,223 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |