Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2024 |
Principal Product | Toasts and pastries, breakfast bars (fruit and grain bars), gluten free crackers |
NAICS | 311821 - Cookie and Cracker Manufacturing |
SIC | 2052 - Cookies And Crackers |
Sales | $100,000,000-$500,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 7,000,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $160,676 | 6,685,230 | kWh | $0.02 |
Electricity Demand | $114,241 | 13,596 | kW-months/year | $8.40 |
Electricity Fees | $164,650 | - | $ | - |
Natural Gas | $211,336 | 63,188 | MMBtu | $3.34 |
TOTAL ENERGY COSTS | $650,904 | |||
RECOMMENDED SAVINGS* | $25,039 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,001 Cost: $2,566 |
$1,940 | 80,834 | $1,061 | 126 | - | - |
$1,940 80,834 kWh |
$1,061 126 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $215 Cost: $1,256 |
$131 | 5,454 | $84 | 10 | - | - |
$131 5,454 kWh |
$84 10 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $411 Cost: - |
$266 | 11,073 | $145 | 17 | - | - |
$266 11,073 kWh |
$145 17 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $376 Cost: - |
$292 | 12,166 | $84 | 10 | - | - |
$292 12,166 kWh |
$84 10 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,613 Cost: - |
$893 | 37,190 | $721 | 86 | - | - |
$893 37,190 kWh |
$721 86 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,025 Cost: $350 |
$157 | 6,526 | $1,869 | 222 | - | - |
$157 6,526 kWh |
$1,869 222 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $320 Cost: - |
$133 | 5,550 | $186 | 22 | - | - |
$133 5,550 kWh |
$186 22 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,385 Cost: $1,118 |
- | - | - | - | $1,385 | 415 |
- - kWh |
- - kW-months/year |
$1,385 415 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $2,215 Cost: $4,414 |
- | - | - | - | $2,215 | 663 |
- - kWh |
- - kW-months/year |
$2,215 663 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $13,478 Cost: $12,801 |
$8,056 | 335,660 | $5,422 | 645 | - | - |
$8,056 335,660 kWh |
$5,422 645 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,039 Cost: $22,505 |
$11,867 | 494,452 | $9,572 | 1,140 | $3,600 | 1,078 | $11,867 494,452 kWh |
$9,572 1,140 kW-months/year |
$3,600 1,078 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |