Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2024 |
Principal Product | Electric Heaters |
NAICS | 333414 - Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3822 - Environmental Controls |
Sales | $50,000,000-$100,000,000 |
# of Employees | 375 |
Plant Area (Sq.Ft.) | 221,000 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $255,099 | 3,828,976 | kWh | $0.07 |
Electricity Demand | $140,110 | 13,149 | kW-months/year | $10.66 |
Electricity Fees | $34,888 | - | $ | - |
Natural Gas | $155,234 | 27,141 | MMBtu | $5.72 |
TOTAL ENERGY COSTS | $585,331 | |||
RECOMMENDED SAVINGS* | $368,028 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $274,832 Cost: $1,429,458 |
$140,835 | 2,102,020 | $133,996 | 12,570 | - | - |
$140,835 2,102,020 kWh |
$133,996 12,570 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $22,099 Cost: $10,776 |
$22,099 | 329,832 | - | - | - | - |
$22,099 329,832 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS |
Savings: $2,629 Cost: $118 |
$1,836 | 27,404 | $793 | 74 | - | - |
$1,836 27,404 kWh |
$793 74 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $21,638 Cost: $33,160 |
$829 | 12,372 | $20,810 | 1,952 | - | - |
$829 12,372 kWh |
$20,810 1,952 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,340 Cost: - |
$2,085 | 31,123 | $1,255 | 118 | - | - |
$2,085 31,123 kWh |
$1,255 118 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $158 Cost: $432 |
$98 | 1,459 | $60 | 6 | - | - |
$98 1,459 kWh |
$60 6 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,874 Cost: $10,418 |
$1,089 | 16,249 | - | - | $785 | 138 |
$1,089 16,249 kWh |
- - kW-months/year |
$785 138 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $41,459 Cost: $20,803 |
$6,751 | 100,762 | $2,916 | 274 | $31,791 | 5,577 |
$6,751 100,762 kWh |
$2,916 274 kW-months/year |
$31,791 5,577 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $368,028 Cost: $1,505,165 |
$175,622 | 2,621,221 | $159,830 | 14,994 | $32,576 | 5,715 | $175,622 2,621,221 kWh |
$159,830 14,994 kW-months/year |
$32,576 5,715 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |