IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2024
Principal Product Office Space and Labs
NAICS 551114 - Corporate, Subsidiary, and Regional Managing Offices
SIC 6541 - Title Abstract Offices
Sales <$500,000
# of Employees 190
Plant Area (Sq.Ft.) 58,000
Annual Production 1 Units
Production Hrs. Annual 2,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,689 1,001,988 kWh $0.08
Electricity Demand $24,360 2,717 kW-months/year $8.97
Electricity Fees $8,646 - $ -
Natural Gas $41,259 5,059 MMBtu $8.16
TOTAL ENERGY COSTS $156,953
RECOMMENDED SAVINGS* $171,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$116,487
Cost:
$542,440
$71,188 857,654 $45,299 5,050 - - $71,188
857,654
kWh
$45,299
5,050
kW-months/year
-
-
MMBtu
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,362
Cost:
$3,159
$2,966 35,741 $395 44 - - $2,966
35,741
kWh
$395
44
kW-months/year
-
-
MMBtu
03: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$6,404
Cost:
-
$4,273 51,480 $2,131 238 - - $4,273
51,480
kWh
$2,131
238
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$464
Cost:
$614
$251 3,020 $213 24 - - $251
3,020
kWh
$213
24
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,515
Cost:
$419
$1,132 13,644 $383 43 - - $1,132
13,644
kWh
$383
43
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$344
Cost:
$625
$266 3,206 $78 9 - - $266
3,206
kWh
$78
9
kW-months/year
-
-
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,681
Cost:
$2,178
$946 11,400 - - $734 90 $946
11,400
kWh
-
-
kW-months/year
$734
90
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,945
Cost:
$1,100
$68 816 $3,088 344 $790 97 $68
816
kWh
$3,088
344
kW-months/year
$790
97
MMBtu
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$125
Cost:
$580
$105 1,262 $20 2 - - $105
1,262
kWh
$20
2
kW-months/year
-
-
MMBtu
10: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$23,488
Cost:
$41,533
$15,460 186,267 $8,028 895 - - $15,460
186,267
kWh
$8,028
895
kW-months/year
-
-
MMBtu
11: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$304
Cost:
$256
$172 2,121 $42 5 $90 11 $172
2,121
kWh
$42
5
kW-months/year
$90
11
MMBtu
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,748
Cost:
$5,386
- - - - $13,748 1,685 -
-
kWh
-
-
kW-months/year
$13,748
1,685
MMBtu
TOTAL RECOMMENDED Savings:
$171,866
Cost:
$598,290
$96,827 1,166,611 $59,677 6,653 $15,362 1,883 $96,827
1,166,611
kWh
$59,677
6,653
kW-months/year
$15,362
1,883
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas