Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2024 |
Principal Product | Chemicals |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 1,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,664 | 3,115,716 | kWh | $0.03 |
Electricity Demand | $51,438 | 5,710 | kW-months/year | $9.01 |
Electricity Fees | $128,017 | - | $ | - |
Natural Gas | $430,474 | 92,516 | MMBtu | $4.65 |
TOTAL ENERGY COSTS | $710,593 | |||
RECOMMENDED SAVINGS* | $165,486 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2161 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS |
Savings: $9,651 Cost: $7,079 |
$(-561) | (-17,520) | $(-36) | (-4) | $9,149 | 1,947 | $1,099 | 183 | - | - |
$(-561) (-17,520) kWh |
$(-36) (-4) kW-months/year |
$9,149 1,947 MMBtu |
$1,099 183 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,562 Cost: - |
$4,735 | 147,980 | $1,826 | 203 | - | - | - | - | - | - |
$4,735 147,980 kWh |
$1,826 203 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $24,211 Cost: $220,985 |
$9,227 | 288,346 | $14,984 | 1,663 | - | - | - | - | - | - |
$9,227 288,346 kWh |
$14,984 1,663 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,107 Cost: $6,125 |
$2,243 | 70,080 | $865 | 96 | - | - | - | - | - | - |
$2,243 70,080 kWh |
$865 96 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $6,524 Cost: $27,807 |
- | - | - | - | $6,524 | 1,388 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,524 1,388 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,557 Cost: - |
- | - | $1,557 | 173 | - | - | - | - | - | - |
- - kWh |
$1,557 173 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,223 Cost: $100,000 |
- | - | - | - | $10,223 | 2,176 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,223 2,176 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $75,451 Cost: $92,231 |
$(-5,017) | (-156,776) | $(-1,935) | (-215) | - | - | - | - | $82,403 | - |
$(-5,017) (-156,776) kWh |
$(-1,935) (-215) kW-months/year |
- - MMBtu |
- - Tgal |
$82,403 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $19,590 Cost: $704 |
- | - | - | - | $19,590 | 4,213 | - | - | - | - |
- - kWh |
- - kW-months/year |
$19,590 4,213 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,979 Cost: $2,430 |
$2,871 | 89,727 | $1,107 | 123 | - | - | - | - | - | - |
$2,871 89,727 kWh |
$1,107 123 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,631 Cost: $8,869 |
- | - | - | - | $4,631 | 985 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,631 985 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $165,486 Cost: $466,230 |
$13,499 | 421,837 | $18,368 | 2,039 | $50,117 | 10,709 | $1,099 | 183 | $82,403 | - | $13,499 421,837 kWh |
$18,368 2,039 kW-months/year |
$50,117 10,709 MMBtu |
$1,099 183 Tgal |
$82,403 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material |