IAC logo
IAC Assessment: IP0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2012
Principal Product Engine Cooling Assemblies and Water Pump Assemblies
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 270
Plant Area (Sq.Ft.) 170,000
Annual Production 34,000,000 Pieces
Production Hrs. Annual 6,912
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $682,736 10,125,900 kWh $0.07
Electricity Demand $134,018 21,015 kW-months/year $6.38
Electricity Fees $1,470 - $ -
Natural Gas $60,898 7,028 MMBtu $8.67
TOTAL ENERGY COSTS $879,122
RECOMMENDED SAVINGS* $63,874 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,223
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$33,112
Cost:
-
$33,112 605,349 - - $33,112
605,349
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,540
Cost:
-
$12,540 229,374 - - $12,540
229,374
kWh
-
-
kW-months/year
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$683
Cost:
-
$683 12,499 - - $683
12,499
kWh
-
-
kW-months/year
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$997
Cost:
$1,803
$816 14,930 $181 26 $816
14,930
kWh
$181
26
kW-months/year
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$16,542
Cost:
$37,000
$16,542 302,585 - - $16,542
302,585
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$63,874
Cost:
$38,803
$63,693 1,164,737 $181 26 $63,693
1,164,737
kWh
$181
26
kW-months/year
TOTAL IMPLEMENTED Savings:
$13,223
Cost:
-
$13,223 241,873 - - $13,223
241,873
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand