Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2013 |
Principal Product | Fuel System Components |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3536 - Hoists, Cranes, And Monorails |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 15,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $273,797 | 5,456,400 | kWh | $0.05 |
Electricity Demand | $154,403 | 14,001 | kW-months/year | $11.03 |
Natural Gas | $41,957 | 7,496 | MMBtu | $5.60 |
TOTAL ENERGY COSTS | $470,157 | |||
RECOMMENDED SAVINGS* | $62,919 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,542 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Other Gas | Electricity Usage | Electricity Demand | Electricity Fees | Other Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,644 Cost: - |
$1,644 | 36,060 | - | - | - | - | - | - |
$1,644 36,060 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,757 Cost: - |
$4,501 | 86,899 | $1,256 | 119 | - | - | - | - |
$4,501 86,899 kWh |
$1,256 119 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $730 Cost: - |
$730 | 16,000 | - | - | - | - | - | - |
$730 16,000 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,044 Cost: $118 |
$1,044 | 22,895 | - | - | - | - | - | - |
$1,044 22,895 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $24,010 Cost: $1,400 |
$24,010 | 463,518 | - | - | - | - | - | - |
$24,010 463,518 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,093 Cost: $380 |
- | - | - | - | - | - | $7,093 | 496 |
- - kWh |
- - kW-months/year |
- - $ |
$7,093 496 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,795 Cost: $8,625 |
$8,440 | 162,936 | $2,355 | 223 | - | - | - | - |
$8,440 162,936 kWh |
$2,355 223 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $10,702 Cost: $17,052 |
- | - | - | - | $10,702 | - | - | - |
- - kWh |
- - kW-months/year |
$10,702 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,144 Cost: $3,702 |
$1,144 | 25,101 | - | - | - | - | - | - |
$1,144 25,101 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,919 Cost: $31,277 |
$41,513 | 813,409 | $3,611 | 342 | $10,702 | - | $7,093 | 496 | $41,513 813,409 kWh |
$3,611 342 kW-months/year |
$10,702 - $ |
$7,093 496 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,542 Cost: $10,405 |
$34,094 | 662,514 | $2,355 | 223 | - | - | $7,093 | 496 | $34,094 662,514 kWh |
$2,355 223 kW-months/year |
- - $ |
$7,093 496 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Other Gas | Electricity Usage | Electricity Demand | Electricity Fees | Other Gas |