IAC Assessment: IP0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2013
Principal Product Electroplating and Surface Finishing
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 50,000
Annual Production 279,609,150 Pieces
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,941 1,452,480 kWh $0.09
Natural Gas $11,833 1,475 MMBtu $8.02
TOTAL ENERGY COSTS $157,574
RECOMMENDED SAVINGS* $44,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,837
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Primary Raw Material Electricity Usage Electricity Fees Personnel Changes Primary Raw Material
$ kWh $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$744
Cost:
-
$744 8,362 - - - - - - $744
8,362
kWh
-
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,701
Cost:
-
- - $11,701 - - - - - -
-
kWh
$11,701
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$805
Cost:
-
$805 9,048 - - - - - - $805
9,048
kWh
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,167
Cost:
$1,400
$9,167 102,997 - - - - - - $9,167
102,997
kWh
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,754
Cost:
$409
$1,754 19,711 - - - - - - $1,754
19,711
kWh
-
-
$
-
-
$
-
-
$
06: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$600
Cost:
$159
- - - - $600 - - - -
-
kWh
-
-
$
$600
-
$
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,599
Cost:
$15,000
- - - - - - $13,599 - -
-
kWh
-
-
$
-
-
$
$13,599
-
$
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,689
Cost:
$3,600
$2,689 30,211 - - - - - - $2,689
30,211
kWh
-
-
$
-
-
$
-
-
$
09: 2.2514 COVER OPEN TANKS Savings:
$373
Cost:
$503
$373 4,193 - - - - - - $373
4,193
kWh
-
-
$
-
-
$
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,437
Cost:
$9,348
$3,437 38,613 - - - - - - $3,437
38,613
kWh
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,869
Cost:
$30,419
$18,969 213,135 $11,701 - $600 - $13,599 - $18,969
213,135
kWh
$11,701
-
$
$600
-
$
$13,599
-
$
TOTAL IMPLEMENTED Savings:
$27,837
Cost:
$11,819
$15,536 174,562 $11,701 - $600 - - - $15,536
174,562
kWh
$11,701
-
$
$600
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Primary Raw Material Electricity Usage Electricity Fees Personnel Changes Primary Raw Material